Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 21, 2025 at 7:00 PM
Updated January 22, 2025
Renovation of a military facility in Natick, Massachusetts. Completed plans call for the renovation of a military facility.
Natick (Armory) Readiness Center PVC Roof Repairs [MA Army National Guard]. Roof ripped off storage facility causing leaking within the office. Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The roof edge blocking failed along 70 lineal feet of the eave edge and approx. 4,000 SF of PVC membrane has delaminated exposing the roof insulation and substrate. Contractor shall provide a temporary preventative measure to avoid additional damage and/or substrate failure. The Contractor shall comply with site and OSHA safety regulations while performing work on site. Contractor shall provide Site Safety and Associated Hoisting along with required materials and labor, set up a roof safety perimeter with D-Ring Tie Off Anchors as required for roof edge work, remove damaged wood Nailer and PVC debris from delaminated area - download to dumpster, slice existing PVC membrane as needed and peel back over the roof area (70'x66'), supply and install up to 140 LF of new roof edge Nailer 1/2 " and/or 1.5" where damaged, supply and install 1,000 SF of 1.5" x 4'x4' Base Layer Insulation infill where damaged, secure membrane using screws and plates and/or bonding, install PVC patch 10'x70' of PVC membrane at eave edge and secure to wood blocking, install PVC target patch or batten bar along parapet wall where delaminated as needed, secure existing PVC with screws & plates or batten bar and strip in with 6" flashing, to tie-in with existing PVC to assure positive drainage to the roof edge, supply and install 70 LF of 3" drip edge metal at damaged area and tie in with existing, inspect roof area and patch holes or slices remaining in this roof area, remove and dispose of roofing related trash and debris from our scope of work, work to be during Normal working hours (M-F 7am3pm). Contractor shall send schedule to POC 2 weeks prior to repair.
Bid Results
Military
$42,895.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 27, 2024
January 17, 2025
149 Speen St, Natick, MA
Related To This Project
Natick, MA
--
Natick, MA
--
Natick, MA
Bid Date: Feb 13 2025
Natick, MA
Bid Date: Jan 22 2025
Natick, MA
Bid Date: Mar 11 2019
Natick, MA
Bid Date: Jul 14 2025
Natick, MA
Bid Date: Dec 18 2024
Natick, MA
--
Natick, MA
Bid Date: Dec 09 2024
Natick, MA
Bid Date: Dec 09 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
