EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 13, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in New Kensington, Pennsylvania. Completed plans call for site work for a water / sewer project.

Filter Media Replacement Projects: 2024 Waterline Replacement (7th Street, Beamer Avenue, Dugan Way, Fairmont Street, Willis Road, Lincoln Street) Contract 2/2024 Filter Media Replacement Contract 3/2024 This Project is Federally Funded by Epa Financial Assistance Dollars and Therefore Requires All Contractors to Demonstrate Compliance With Federal Executive Orders 11625, 12138, and 12432 and Epa Regulations at 40 Cfr Part 33, Through the Detailed Documentation of Solicitation of Disadvantage Business Enterprises (Dbes). Contractors Must Demonstrate the Six Good Faith Efforts to Identify and Solicit Dbe Firms That Are Potential Sources for Any Procurement Action in the Areas of Project Construction, Equipment, Services, and Supplies by Including State Qualified Small Businesses, and Minority and Women Owned Business Enterprises in the Bidding Process. A Certified Check, Payable to the Municipal Authority of the City of New Kensington, or a Satisfactory Bid Bond Executed by the Bidder and an Acceptable Surety in an Amount Equal to 10 Percent (10%) of the Total of the Bid Shall Be Submitted With Each Bid to Guarantee the Bidders Entrance Into a Contract if Given the Award. No Bid Bond Shall Be Waived or Returned Because the Bidder Has Failed to or Cannot Comply With Any Requirements Set Forth in the Plans, Specifications, or Any Applicable Statutes of the Commonwealth of Pennsylvania, or Any Applicable Municipal Ordinances. All Contractors Must Adhere to Act 127 of 2012 (Public Works Employment Verification Act), Nondiscrimination/sexual Harassment Provisions, State Contractor Responsibility Program, the Americans With Disability Act, Anti-pollution Regulations, Contractor Integrity Provisions, Prohibition of Illegal Alien Labor on Assisted Project Act and the Right-of-know Law and the American Iron & Steel Act. Prevailing Wages Established Under the Davis-bacon Act Will Apply to These Contracts. The Municipal Authority of the City of New Kensington Reserves the Right to Reject Any or All Bids or to Waive Any Informalities in the Bidding. Award Criteria and Basis for Rejection Will Be in Accordance With the Instructions to Bidders Included in the Project Manual/bid Package. No Bid May Be Withdrawn for One Hundred Twenty (120) Calendar Days After the Scheduled Closing Time for Receipt of Bids. Question Deadline 01/03/2025 All requests for interpretation must be received by the Engineer at least five (5) days before the date set for bid opening.

Bid Results

Water / Sewer

$798,700.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Plugging, Seeding, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Dies and Molds, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
56
Bidding Soon
892
All Active Projects
431
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2025

February 10, 2025

img_map_placeholder

To Be Determined, New Kensington, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Water Treatment Plant Filter Media Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.