Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 21, 2025 at 7:00 PM
Updated January 22, 2025
Site work for a water / sewer project in Leadore, Idaho. Completed plans call for site work for a water / sewer project.
Construction- Pipeline Reconstruction in Region 4 of Forest Service Salmon-Challis National Forest Between $25,000 and $100,000. PROJECT LOCATIONS A. The project is located on the Leadore Ranger District of the Salmon-Challis National Forest, Lemhi County, Idaho. Access to the area is via Forest Service roads 350 and 427 on the Leadore Ranger District. Off-road/non-system route travel will be required to get to some areas of the pipeline. Authorization of cross-country travel where appropriate will be designated by the COR and will also be dependent on weather that may limit use due to potential resource damage. This project includes the installation of approximately 7,500 feet of buried 1-1/4" HDPE nonpotable water line. Work also includes the removal and disposal of all existing waterline and associated connections. The pipeline serves water from a spring source to three rangeland water troughs on Forest Service owned property. Final location and routing of pipeline will be flagged and determined onsite with Contracting Officer's Representative (COR). PROJECT LOCATION: Site is located on the Salmon-Challis National Forest, Leadore Ranger District approximately 22 miles southeast of Salmon, ID. Travel will consist of highway/paved roads from contractor's duty location to Haynes Creek Road. From this turn off, there is a mixture or road conditions including paved, well maintained dirt roads, rough unmaintained dirt roads, and cross-country travel to the construction site approximately 4-5 miles off Highway 28 Between $25,000 and $100,000 This project includes the installation of approximately 7,500 feet of buried 1-1/4" HDPE nonpotable water line. Work also includes the removal and disposal of all existing waterline and associated connections. The pipeline serves water from a spring source to three rangeland water troughs on Forest Service owned property. Final location and routing of pipeline will be flagged and determined onsite with Contracting Officer's Representative (COR). Site is located on the Salmon-Challis National Forest, Leadore Ranger District approximately 22 miles southeast of Salmon, ID. Travel will consist of highway/paved roads from contractor's duty location to Haynes Creek Road. From this turn off, there is a mixture or road conditions including paved, well maintained dirt roads, rough unmaintained dirt roads, and cross-country travel to the construction site approximately 4-5 miles off Highway 28. All questions are due December 13th, 2024. There will be no pre-bid meeting and no site visit scheduled. In order to be considered responsive the offeror shall complete and address the items below (see Items 1 thru 4). Construction- Pipeline Reconstruction in Region 4 of Forest Service Salmon-Challis National Forest The questions due date has been extended to 12/19/2024. A site visit is being scheduled for Monday, December 16th, 2024 at 1100 MST at 1206 S. Challis Street, Salmon ID 83467. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Water / Sewer
$100,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
19
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 20, 2025
May 1, 2025
Multiple Locations, Leadore, ID
Related To This Project
Leadore, ID
Bid Date: Jul 29 2025
Leadore, ID
Bid Date: Apr 09 2024
Nampa, ID
Bid Date: Jan 07 2025
Meridian, ID
Bid Date: Dec 20 2024
Nampa, ID
--
Boise, ID
Bid Date: Dec 18 2024
Garden City, ID
Bid Date: Dec 12 2024
Saint Anthony, ID
Bid Date: Dec 17 2024
Boise, ID
Bid Date: Mar 04 2025
Rexburg, ID
--
Ririe, ID
Bid Date: Dec 18 2024
Marsing, ID
Bid Date: Dec 09 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
