BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Pascagoula, Mississippi. Completed plans call for site work for a water / sewer project.

Cherry Park Drainage Improvements The County reserves the right to reject any or all bids not conforming to the intent and purpose of the specifications, and to postpone the award of the Contract for a period of time which, however, shall not extend beyond 90 days from the bid opening date. Bids must be accompanied by a satisfactory Bid Bond payable to the Jackson County Board of Supervisors in an amount of five percent (5%) of the total bid, duly executed by Bidder and an acceptable surety." BID DATE NOTES -- Sealed bid envelopes shall be marked "SEALED BID FOR JACKSON COUNTY -CHERRY PARK DRAINAGE IMPROVEMENTS TO BE OPENED AT 1:00 PM, Tuesday, January 21st " and if any envelope is not so marked, any bid contained therein will not be considered. A. The work covered by this section consists of preparatory work and operations, including but not limited to those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for providing the items required by the General Conditions, Supplementary Conditions, and General Requirements including but not limited to: 1. The establishment of all temporary offices, buildings, fencing, staging areas, haul routes, and other facilities necessary for the work on the project; 2. Surveying and construction staking; 3. All barricades, traffic control signage, and detour devices; 4. Performance bond, Payment bond; 5. Insurance; and all other work and operations which must be performed or costs incurred prior to beginning work on the various items on the project site. B. This item also includes all work outside the limits of construction that is necessary to demobilize and restores areas disturbed by the Contractor to their original condition including, but not limited to, pavement rehabilitation, grading, seeding, mulching, cleaning, and disposal. Administrative and supervisory requirements necessary for coordination of work on the project include but are not necessarily limited to the following: 1. Coordination and meetings. 2. Surveys and records or reports. 3. Limitations on use of site. 4. Special reports. 5. General installation provisions. 6. Cleaning and protection. 7. Conservation and salvage. 1. Abbreviations that may be used in the Contract Documents including the drawings are listed in this section and have the identifications and meanings shown herein except where otherwise indicated. 2. Symbols are identified on the drawings. 3. Related requirements in other parts of the Contract Documents. a. Drawing symbols: Contract drawings b. Drawing abbreviations: Contract drawings. A. General: This section specifies procedural and administrative requirements for compliance with governing regulations, codes and standards imposed upon the work. These requirements include obtaining permits, licenses, inspections, releases and similar documentation, as well as payments, statements and similar requirements associated with regulations, codes and standards. B. The term "Regulations" is defined to include laws, statutes, ordinances and lawful orders issued by governing authorities, as well as those rules, conventions and agreements within the construction industry which effectively control the performance of the work regardless of whether they are lawfully imposed by governing authority or not. C. Governing Regulations: Refer to General Provisions, Supplementary Conditions, and General Requirements for requirements related to compliance with governing regulations. A. Method of Measurement and Payment: This section establishes the method of measurement and payment for work performed under this contract. B. Unit Price: Except where lump sum is indicated, payment for work performed shall be made on a unit price basis in accordance with the accepted bid and the method of payment provided in the General Provisions. C. Related Requirements in Other Parts of the Specifications: 1. Bid (Proposal) 2. Agreement. 3. Conditions of the Contract. D. Related Requirements Specified in Other Sections: 1. Summary of Work - Section 01010. 2. Submittals - Section 01300. 3. Contract Closeout - Section 01700. E. Work with No Identified Payment Items: No additional payment will be made for items of work for which a separate payment item is not specified or contained in the Bid Schedule; such work shall be deemed incidental to the project and payment for said work shall be considered as included in the various unit bid prices. A. General: Required inspection and testing services are intended to assist in the determination of probable compliance of the work with requirements specified or indicated. These required services do not relieve the Contractor of responsibility for compliance with these requirements or for compliance with requirements of the Contract Documents. B. Specified Inspection and Tests: Inspection, tests and related actions specified in this section and elsewhere in the Contract Documents are not intended to limit the Contractor's own quality control procedures which facilitate overall compliance with requirements of the Contract Documents. C. Contractor Quality Control: Requirements for the Contractor to provide quality control services as required by the Engineer, the Owner, and the provisions of this section do not limit governing authorities or other authorized entities. D. Contractor's Quality Control Personnel and Laboratory: Contractor shall conform to the requirements of Section S-700 of the Mississippi Standard Specifications for State Aid Road and Bridge Construction and all technical specifications as listed in this manual. A. Contractor shall furnish, install and maintain temporary utilities required for construction and other temporary facilities as indicated; remove on completion of work. B. Related requirements are specified in other sections of the specifications. Contractor shall execute cleaning during progress of the work and at completion of the work as required by the General Provisions and other specification documents.

GC Bidding

Water / Sewer

$200,000.00

Public - County

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
19
Bidding Soon
409
All Active Projects
190
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2025

February 20, 2025

img_map_placeholder

To Be Determined, Pascagoula, MS

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.