BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Pendleton, Oregon. Conceptual plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Proposals for Engineering Design of Ctuir Well Site and Water Metering System Upgrades The Project Purpose and Description is to Provide Engineering and Design Services for Two Upgrade Projects for the Ctuir Public Works Department. The Project #1 Scope of Work Includes Engineering Design and Project Management for the Construction of the Following: . Well 3 Onsite Generator With Automatic Transfer Switch . Wells 1 & 2 Security Fencing: 550' Linear Feet of 8' Chain Link Fence With Three-strand Barbed Wire . Well 4 Onsite Generator With Automatic Transfer Switch and Security Fencing: 220' Linear Feet of 8' Chain Link Fence With Three-strand Barbed Wire. . Design Work Will Include Sizing the Onsite Generator and Automatic Transfer Switch at Wells 3 and 4. . Upgrades to Water Fill Station (Well 4) . Chlorine Room Improvements - Addition (Wells 1&2) Venting (Well 6 ) . Hvac Minisplit- 5 Locations (Booster, Wells 1&2, Well 3, Well 4, Well 5) . Roof Repair / Replacement for Well Houses- (Wells 1&2, Well 5) . Painting (Interior / Exterior) - 5 Locations (Booster Station, Well 3, Well 4, Well 5) the Project #2 Scope of Work Includes Engineering Design Project Management for the Construction of the Following: . 290 Residential Water Meter Replacements . 62 Non-residential Water Meter Replacements . Installation of an Advanced Metering Infrastructure (Ami) System. . Outline Compatible Billing Programmatic System for Auto-population of Data Project Timeline: Project Work Expected to Begin in 2025 With Completion to Be Determined During Contract Negotiations. the Ctuir Reserves the Right to Evaluate All Proposals to Ensure That the Best Interest of the Ctuir is Served Thereby. The Owners Rights Are Listed in More Detail in the Full Rfp Document. The Method of Contractor Selection Has Not Been Determined at This Time.

Conceptual

Water / Sewer

$500,000.00

Public - Federal

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
7
Bidding Soon
94
All Active Projects
37
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2025

img_map_placeholder

Multiple Locations, Pendleton, OR


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.