BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 25, 2025 at 7:00 PM

Updated February 26, 2025

Site work for a water / sewer project in El Reno, Oklahoma. Completed plans call for site work for a water / sewer project.

to wit: Quantity - Unit - Description 3,388.00, L.F., 12" PVC C900 DR18 Waterline 365.00, L.F., 14" PE SDR 11 Waterline 408.00, L.F., Bore and Install 18" Stl. Casing, 0.25" Thk. 7.00, Ea., 12" Gate Valve and Box Funding for this project is provided through the FAP loan program. As such, compliance with Labor Standards Contract Provisions is mandatory. A bid bond in the amount of 5% of the total amount bid shall be attached to all bids as a guarantee that the successful bidder will, within ten (10) days of the date of notice of award, enter into contract and fi le the required bonds. No bidder may withdraw his bid within 45 days after the actual date of the opening thereof. The Owner reserves the right to reject any or all bids, waive any irregularities or technicalities without assigning any reason therefore, and to make the awards in the best interest of the Owner. Contractor must obtain plans and specifi cations from the Offi ce of the Engineer and be registered on the Engineer's bid list to be recognized as an eligible bidder for this project. This project is to be fi nanced by a FAP Bond Loan from the Oklahoma Water Resources Board (OWRB) and shall be referred to as Project No. FAP-23-003-L. The following requirements and regulations must be complied with: "Equal Opportunity in Employment: All qualifi ed applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, age or physical handicap. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended." Off erors are responsible for submitting proposals, and any modifi cations or revisions, so as to reach the offi ce designated in the solicitation by the time specifi ed in herein. Any proposal, modifi cation or revision received at the offi ce designated in the solicitation after the exact time specifi ed for receipt of off ers is "late" and will not be considered. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. $720,000 - $740,000

Award

Water / Sewer

$680,959.00

Public - City

Site Work

21

16

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
70
Bidding Soon
675
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 3, 2025

February 3, 2025

Project location map

US-81, El Reno, OK


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.