BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Evans, Georgia. Completed plans call for the renovation of a educational facility.

Perform cooler and freezer replacement services at two CCSD locations for Bid number HC-01-14-25A. All questions or request for information relating to this solicitation shall be directed to Steve Bohler by email Steve.Bohler@CCBOE.net. Please copy Hudson.Chandler@CCBOE.net as well Award to be before the end of March 2024. Work can be performed in June and July, schools must be completed before July 26 New Cooler & Freezer Box and Equipment Specifications Preferred Refrigeration Box: American Panel Secondary Refrigeration Box: LEER Third Refrigeration Box: Bally Box Temperatures: Boxes must be capable of operating at -10 degrees at all times Wall Thickness: Preferred: 5" Panels with a 6" Cooler/Freezer Divider Panel Preferred Refrigeration Equipment: Trenton Secondary Refrigeration Equipment: Heat Craft Bid Must Include: o Labor to demo, remove, and dispose of existing walk-in cooler & freezer boxes, equipment, electrical, and line sets o Clean and prep area for new box installation o Leveling of floor area for new box to be installed o Recover and dispose of freon in old equipment o Labor and all material to install a new walk in cooler & freezer box, equipment, and line sets according to Manufacturer's Recommendations o Sprinkler System- Removing of old sprinkler heads in the boxes. Installing of new sprinkler heads in new boxes o All electrical demo and new install needs must be included in bid o All Concrete, Block, and Tile Work if Needed Specifications: o Floor panel levelers, if used, must be manufacturer approved. Levelers must not compress over time. Roof Shingles or Non-Cedar wood shims are not CCBOE approved to be used to level the floor panels. o Floor panels must be a minimum Level 2 Heavy Duty rated for a minimum 1200psf stationary load, heavy shelf loading, moderate carts, and heavy foot traffic. Information is from American Panel. Other brands must meet or exceed this rating. o Floor panels must be supported according to Manufacturers Recommendations throughout the whole floor o Floor Panels must have diamond tread plate o All openings in the floor panels, wall panels, and ceiling panels must be sealed to meet manufacturer's specifications so no moisture or sweating occurs o All doors must have vinyl strip curtains installed o Heavy-Duty stainless steel threshold plates must be included and installed o New copper line set must be installed o Copper line sets must be clamped and secured o Copper line sets must include a minimum of 2" Armor Flex insulation o Copper being brazed must be purged with nitrogen during the brazing process o New Refrigeration system must be leak checked to 400 psi. System must hold for 24 hours. FMO must be notified of start and end of test for verification. o New Refrigeration system must be vacuumed to <500 microns. FMO must be notified for verification. o Line set cover on the outside of building must be installed to hide line set o If system has dual evaporators, install them on a single pump down valve o Provide and install new electrical disconnects and electrical whips for Condenser Units o New cooler & freezer systems must have a minimum of a 5 year compressor warranty and a 2 year parts and labor warranty on whole system including the box o All doors must include heavy duty hinges, lockable handles, door closures, and all hardware o Boxes must have a digital readout of the inside temperature located on the outside of each cooler and freezer box. o Cooler and freezer box doors must have door frame heaters installed o Cooler and freezer boxes must include LED vapor proof lighting installed o Freezer pressure relief vents must be heated o Refrigeration Units must have the winterization controls included to be able to operate in low ambient conditions o Refrigeration freezer unit must include electric defrost and defrost controller o Provide and install a new ACR Copper drain lines. Freezer drain must be insulated and include heat cord o Provide and install metal flashing on the exposed side of the new boxes o All Walk-In Cooler and Freezer Panels and Equipment must be UL Rated and Certified

Sub-Bidding

Educational

$300,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
25
Bidding Soon
496
All Active Projects
205
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2025

February 13, 2025

img_map_placeholder

Multiple Locations, Evans, GA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.