BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Newark, Delaware. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Pre-bid Meeting: No Dbe Goal: 14% Disadvantaged Business Enterprise Goal Ojt Trainees: 0 Location: New Castle County These Improvements Are More Specifically Shown on the Location Map(S) of the Attached Plans. Description: the Improvements Consist of Furnishing All Labor and Materials for the Design and Construction of a New Side Path Along Old Baltimore Pike. This Project Will Span Along Old Baltimore Pike in Newark, Delaware, Linking De State Route 72 to Walther Road, Covering a Distance of 2.1 Miles. It Involves the Construction of a 6-foot-wide Concrete Path That Complies With Ada Standards, Accompanied by a 2-foot Grass Buffer. The Purpose of the Project is to Improve Safety and Connectivity for Pedestrians and Cyclists. The Need of This Project is to Fill a Gap in the Current Sidewalk Network Along Old Baltimore Pike. Additionally, There is a Need to Enhance Existing Curb Ramps, Driveway Aprons, Roadway Lighting, Signage, Pavement Markings, and Upgrade Traffic Signals. These Improvements Are Strategically Designed to Encourage a Transition Away From Vehicle-centric Transportation, Promoting and Facilitating Non-motorized Modes of Travel Such as Walking and Biking. Follow Other Incidental Construction in Accordance With the Location, Notes and Details Shown on the Plans, and as Directed by the Engineer. Completion Time: All Work on This Contract Must Be Complete Within 249 Calendar Days. Extensions of Contract Time Due to Weather Are Specified in the Standard Specifications Section 108.7f, Weather Days. It is Estimated a Notice to Proceed is Issued Such That Work Starts on or About March 10, 2025. Question Deadline 12/30/2024 Questions: E-mail to; dot-ask@delaware.gov Questions regarding this project are to be e-mailed to the above address no less than six business days prior to the bid opening date in order to receive a posted response. Each proposal must be accompanied by a deposit of either surety bond or security for a sum equal to at least 10% of the amount bid. Performance-based Rating System - 29 Del.c. $6962 (C)(12)(a) Requires Deldot to Include a Performance-based Rating System for Contractors. The Performance Rating for Each Contractor Shall Be Used as a Prequalification to Bid at the Time of Bid. Refer to general Notices for Details. DE DOT - Old Baltimore Pike Side Path, Phase II

GC Bidding

Sidewalks / Parking Lot

$300,000.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

151

6

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
278
Active Projects
116
Bidding Soon
2,545
All Active Projects
1,017
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.