Renovation of a water / sewer project in Naples, Florida. Completed plans call for the renovation of a water / sewer project.

the construction of the SCRWTP Electrical Reliability Phase IIB Project Question Deadline 01/14/2025 at 5:00 PM ET SUMMARY A. Section includes: Detailed description of the Work. B. The work consists of but is not limited to removal, replacement and installation of: 1. Six lighting panels: LD, LE, LF, LB, LC, LAB. 2. Power Panel Surge Protection: 1iP1, 1PP-2, ILP-3, 1PP-3. 3. One fluoride control panel and supporting/stanchion structure. 4. Three reactor clarifier control panels. 5. Lime Plant degasification Tower (Upper 3 rd level) - replacement of two recirculation pump electrical disconnect, circuit breaker, motor starter, and control devices. 6. Removal of existing surge tank control panel, instrumentation and electrical conduits and cabling. Installation of new instruments, conduit and cabling to the existing surge tank and integration with PLC-3. 7. Lime Plant East and West control panel removal, replacement and installation 8. Testing of all equipment. 9. Site inspection of all areas. 10. Complete cut over planning. See appendix for example cut over plan to be developed and completed by contractor for each cutover. 11. Complete temporary power and controls as necessary to ensure the plant operates completely at all times. C. Additional work consists of but not limited to the following: 1. Add electrical motor disconnects for RO Feed Pumps 1-10, RO Booster Pumps 1-4. 2. Addition of E-stop for each of the High Service Pump-1-6. 3. Updates to deep injection control panel (PLC 1.11). 4. RO east and west control panel fuse, relay and power supply replacement. 5. Fluoride control panel and supporting structure replacement. 6. Testing of all equipment. 7. Site inspection of all areas. 8. Complete cut over planning. 9. Complete temporary power and controls as necessary to ensure the plant operates completely at all times. D. Contractor shall supply all necessary equipment including but not limited to all wire, cable, circuit breakers, fasteners, mounting hardware, and brackets as required for a fully operational system. All wire terminations, both power and control shall be performed by the contractor. No cable splicing of any kind will be accepted.

Sub-Bidding

Water / Sewer

$4,853,118.00

Public - County

Renovation

71

30

2

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
34
Bidding Soon
399
All Active Projects
152
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2025

March 24, 2025

img_map_placeholder

3851 City Gate Dr, Naples, FL

New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.