Site work for a water / sewer project in Milwaukee, Wisconsin. Completed plans call for site work for a water / sewer project.

WATER MAIN RELAYS, at the following locations: W. CONGRESS ST. (WT410230633), . 60TH ST. TO N. 63RD ST., (23 working days); W. MEDFORD AV./ N. 61ST ST. (WT410230634), W. CONGRESS ST. TO N. 64TH ST., (33 working days); N.63RD ST. / W. BALDWIN ST. (WT410230635), 250 S/O W. RUBY AV. TO W. MEDFORD AV., (11 working days); W. RUBY AV. (WT410230636), N. 63RD ST. TO N. 65TH ST., (11 working days); W. RUBY AV. (WT410230637), N. 66TH ST. TO N. 68TH ST., (11 working days); N. 68TH ST. (WT410230638), W. CONGRESS ST TO W. GLENDALE AV., (29 working days): S. 79TH ST. (WT410230654), W. OHIO AV. TO W. VERONA CT., (22 working days); S. 81ST ST. (WT410230655), W. BURDICK AV. TO W. OHIO AV., (10 working days); W. BURDICK AV. (WT410230680), W RIVER BEND DR. TO S. 75TH ST., (16) working days); W. RIVER BEND DR. (WT410230681), W. BURDICK AV. TO W. HONEY CREEK DR., (6 working days); S. 75TH ST. (WT410230682), W. HONEY CREEK DR. TO W. OHIO AV., (11) working days); (Note: Contractor to furnish and install approximately 9,327 lin. ft. of 16", 12", 8" and 6" ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.) Time for Completion: No work may take place between December 16, 2024 and March 17, 2025 unless Otherwise approved by the MWW Construction Engineer. All work including pavement restoration must be completed by August 1, 2025. Contractor shall use multiple crews, as necessary, to meet completion deadline. Liquidated Damages, per diem: $1,000.00 The residency requirement for this project is 40% of all hours. worked on the project. The SBE requirement for this project is 25% of the contract base bid. The SBE Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. SBE certificates must be submitted with the Form A. Incomplete SBE Compliance Plans (Form A) or inaccurate SBE Compliance Plans will not be accepted and will render the bid unresponsive. For a complete listing of City of Milwaukee certified SBE firms, see the Office of Equity and Inclusion's (OEI) website at https://milwaukee. diversitycompliance.com/. If there are any questions regarding SBE firms, please contact the OEI office at 414-286-5553. The apprenticeship requirements for this project are: one Construction Craft Laborer. If this contract is awarded at $500,000 or higher, 25% of all apprentice labor hours. must be worked by apprentices certified for participation in the Residents Preference Program and 40% of all apprentice labor hours must be attributed to apprentices living in the following zip codes: 53204, 53205, 53206, 53208, 53210, 53215, and 53233. The contractor shall specifically note the SBE, residency, and apprenticeship forms for this project. If the forms are not filled out properly, it will be cause for rejection of the bid. Bid Security Required: Bond, Certified Check, Cashier's Check or Cash to accompany bid: 10% of the Contractor's Base Bid.

GC Bidding

Water / Sewer

$400,000.00

Public - City

Site Work

14

3

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
49
Bidding Soon
1,051
All Active Projects
444
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2024

January 16, 2025

img_map_placeholder

Multiple Locations, Milwaukee, WI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.