BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 18, 2026 at 8:00 PM

Updated August 24, 2026

Site work for a road / highway in Myrick, Oregon. Completed plans call for site work for a road / highway.

Region 5 -82/US730: Freight & Congestion Improvements Project McNary & Columbia River Hwys Joshua McCullough, RE ($ 1,000,000 - $ 2,000,000) Freight & Congestion Improvements Project on the McNary & Columbia River Highways (Rt. No. I-82 & US730) near Umatilla. FAP No. SA00(597). ($ 1,000,000 - $ 2,000,000). Req. approx. 900 ft2 temp. signs; 2 ea seq. arr. sign; 2 ea PCMS; 1 ea rdr. spd. trlr.; 80 hrs flag.; 2 ea TMA; 550 ft sed. barr.; const. surv. wrk.; 690 yd3 emb.; 1,400 yd2 geot.; 250 ton aggr. base; 100 ft gd. rl.; 1 ea xwalk. clos. sup.; rem. & reinstall. extg. signs; 465 fbm wood sign post; 24 yd3 conc. in sign sup.; 7,280 lb st. in sign sup.; 103 ft2 signs; telecom. mtrl.; telecom. install.; telecom. spl. & test.; 5 ea ITS elec. sys. install.; 16 ft sig. sup. drill. shft.; 0.5 acre seeding; 86 ft rem. & rebuild. fence Class of Work: A) Signing, or B) Electrical The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. To be eligible for award of Oregon Department of Transportation construction contracts, bidders (prime contractors) must submit a prequalification application according to ODOT's Oregon Administrative Rules and prequalification procedures at least ten calendar days before the Bid Closing date. Prequalification must be in the class(es) of work indicated in the project's special provisions, and the bid booklet. ORDOT - 001 - I-82/US730: Freight & Congestion Improvements *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Sub-Bidding

Roads / Highways

$2,000,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
18
Bidding Soon
274
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2026

November 2, 2026

Project location map

Multiple Locations, Myrick, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.