Published December 9, 2025 at 7:00 PM

Updated December 12, 2025

Site work and paving for a civil project in Irrigon, Oregon. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Region 5 Tower Road Interchange Bridge over I-84 Columbia River Highway Joshua McCul ($1,000,000 - $ 2,000,000) Req. approx. 700 ft2 temp. signs; 2 ea seq. arr. signs; 3 ea PCMS; 80 hrs flag.; 4 ea flag. sta. light.; 330 ft sed. barr.; const. surv. wrk.; 67 yd2 rem. of surf.; 220 yd3 exc.; 390 yd2 geot.; 160 yd3 riprap; temp. wrk. acc. & contain.; 115 yd3 st. emb.; br. rem. wrk.; salv. & stckpl. br.; 85 yd2 cl. 2 prep.; 238 yd3 str. exc.; 57 yd3 gran. str. bkfl.; 2,297 lb reinf.; 9,617 ft2 penetr. conc. seal.; 8,028 ft2 conc. & crk. seal.; 5 yd3 str. conc.; 118 yd2 surf. text.; loc. conc. rep.; 29 ft2 conc. rep.; 152 yd2 reinf. conc. br. appr. slabs; 67 ft br. appr. slpr. slabs; 13 ft3 elas. conc. nos. mtrl.; 73 ft2 const. elas. conc. nos.; 67 ft ctrl. jt.; 63 ft sili. jt. seal; 618 ft curb mt. rl.; 340 ft fence; 4 ea br. ID mrkr.; 898 ea rem. & ptch. shall. rebar & anchors; 5,090 yd2 CPPR; 290 ton aggr. base; 1,900 ton ACP (110 ton PG 70-28ER); 4 ea asph. appr.; 413 ft gd. rl.; 9,300 ft pl. comp. striping; rem. & reinstall. extg. signs; 88 fbm wood sign post; 2 yd3 conc. in sign sup.; 526 lb st. in sign sup.; 0.2 acre seeding. Classes of Work: either A) Bridges and Structures, or B) Asphalt Concrete Paving and Oiling. Completion Time: July 31, 2026. This Project Contains Fuel Escalation Clause. This Project Contains a 20% Indian Employment Preference Goal Email the Project Manager Listed at the End of Each Announcement for Project Specific Technical Questions The Oregon Department of Transportation is an Equal Employment Opportunity and Affirmative Action Employer. The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. For Bids submitted by hand delivery, date stamp the Bid with the provided date stamping device and place into the ODOT Procurement Bid Box located in the 1st floor lobby at the following address: Oregon Department of Transportation 355 Capitol Street NE, Salem, Oregon 97301 Bids, Bid modifications, and Bid withdrawals will not be accepted at or after 9:00:00 a.m. on the day of Bid Closing To be eligible for award of Oregon Department of Transportation construction contracts, bidders (prime contractors) must submit a prequalification application according to ODOT's Oregon Administrative Rules and prequalification procedures at least ten calendar days before the Bid Closing date. Prequalification must be in the class(es) of work indicated in the project's special provisions, and the bid booklet. ORDOT - 007 - Tower Road Interchange Bridge Over I-84 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Bridges / Tunnels

$2,000,000.00

Public - State/Provincial

Paving, Site Work

66

10

3

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
18
Bidding Soon
330
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2025

February 9, 2026

Project location map

I-84, Irrigon, OR


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.