EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 31, 2024 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Warren, Michigan. Completed plans call for the renovation of a educational facility.

Reference Number 0000370465 Macomb Community College is receiving proposals for upgrade project that replaces existing Dell access layer switches with new Cisco Catalyst 9300 series switches. This will new hardware, software, licenses, subscriptions, and professional services. In addition, the project will utilize two applications: Cisco Catalyst Center for network management and Cisco Identity Services for network admission control. Award for Sealed Bid Friday, January 31, 2025 (no later) Question Deadline 12/17/2024 at 1:00 PM ET Questions are submitted online No 1. Equipment Preparation and Staging: o New equipment will be unboxed, burned-in, configured, and tested. o Staging will occur at the Customer's location. 2. Removal and Storage: o Existing switches that are removed will be taken to designated storage areas for each campus. 3. Installation and Configuration: o Remove existing switch, rack and power up all access layer switches in the racks provided by MCC. o Upgrade the firmware on all new switches. o Connect to the existing UPS units. o Model the new switch configurations from existing access layer switches, including any Cisco Emergency Responder configuration and port mappings. o Perform initial interface configurations for switch ports on the newly deployed switches, including all VLAN assignments, basic access mode or trunk port configurations, BPDU Guard, and PortFast. o Configure uplinks and default route on the newly deployed switches. o Configure OSPF as needed on the new access layer switch stacks. o Configure the switch IP address, hostname, domain name, NTP, and DNS on the newly deployed switches. o Configure spanning-tree as necessary on the newly deployed switches. o Perform a code upgrade on the newly deployed switches to the latest Cisco recommended code versions, or a customer-requested and documented code version. o Configure the switches in stacks using the included stack and stack power cables. 4. Testing and Documentation: o Vendor will provide acceptance testing and documentation of all switch replacements. o Perform acceptance testing. o Provide documentation of the setup. 5. Maintenance and Patching: o All edge switch replacements will be done during our maintenance windows: any day from 10 PM to 6 AM and Sunday mornings from 6 AM to 12 PM. o All patching of new switches will be completed by the vendor. Existing patch cables can be utilized. Patches should be repatched to the same port as previously connected to. Implementation - Cisco Identity Services Engine (ISE): 1. Installation: o Work with MCC to install and configure the provided Cisco ISE Virtual Machines in the Center and South Campus Data Centers using resources from their existing Microsoft Hyper-V environment. 2. Initial Setup: o Set up an Admin, Monitoring, and Policy Services node at each of the Data Centers. o Integrate all access layer switches with Policy Services Nodes. o Integrate with MCC's existing directory services for user identification, authentication, and authorization. 3. Configuration: o Set up AAA, RADIUS/802.1X Port-based Authentication, MAC Bypass, and Guest Access Services. o Set up BYOD, Device Identification via Profiling, and PxGrid (Integration with Cisco Catalyst Center). o Set up Device Posturing and MDM Integration. 4. Acceptance Testing: o Vendor will provide post-installation acceptance testing.

Post-Bid

Educational

$100,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
127
Bidding Soon
1,645
All Active Projects
734
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 2, 2025

February 3, 2025

img_map_placeholder

14500 12 Mile Rd, Warren, MI


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Cisco Access Switch Upgrades

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.