BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 14, 2025 at 7:00 PM

Updated January 22, 2025

Renovation of an educational facility in West Hartford, Connecticut. Completed plans call for the renovation of a educational facility.

The Town of West Hartford is seeking a contractor for furnishing all labor, materials, equipment, and supplies to install new Modernfold Acousti-Seal 933E Continuously Hinged Electric Operable Wall in existing opening per the attached scope of work. This includes the removal of the current wall divider. This project is located at the King Philip Middle School, West Hartford, 100 King Philip Drive, 06117. The intent of this project is to have a complete and operating wall system. The Town ofWest Hartford is seeking a contractor for furnishing all labor, materials, equipment, and supplies to install new Modemfold Acousti-Seal 933E Continuously Hinged Electric Operable Wall in existing opening per manufacturer's instructions. This project is located at the King Philip Middle School, West Hartford, 100 King Philip Drive, 06117. The intent ofthis project is to have a complete and operating wall system The Scope ofWork will consist of but not limited to the following installation: 1. Demolition: Remove and dispose of old wall and all associated parts.2. Current wall is approx. 72'-3.5" wide and 21 '-3.5" high. Contractor will be responsible for field measurements. SCOPE OF WORK Gymnasium Wall Divider Replacement 3. Provide and install a Modemfold Acousti-Seal 933E Continuously Hinged Electric Operable Wall including STC: 50 (51 +/-1) per ASTM E98 independent acoustic laboratory test; Skins: MDF Board; Finish: Standard Vinyl; Bottom Seals: Floating; Closure: Side Seal; Suspension: #14 Bracket Mounted - all steel, with steel prefinished removable soffit; Suspension Option: 208-volt, 3 phase, 1 horsepower, 60 hertz motor. 5. All Federal, State and Local Codes must be maintained. 6. Supply all necessary submittals/information required by the facilities department, building department or FM Global. 4. Contractor to provide all necessary electrical wiring including wall controls; may need new breaker, wires, and disconnects. Can use existing conduit. Contractor is responsible for obtaining building permits. Building Permit Fees by the town are waived with awarded contract.

Post-Bid

Educational

$25,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
915
Active Projects
475
Bidding Soon
7,083
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2025

February 6, 2025

Project location map

100 King Philip Dr, West Hartford, CT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.