BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 13, 2026 at 7:00 PM

Updated January 14, 2026

Site work and new construction of a mixed-use development in Birmingham, Alabama. Completed plans call for the construction of a military facility; and for site work for a military facility.

Design Bid Build Construction of a 600-member ARC, AMSA VMS and an Unheated Storage Building in Birmingham, Alabama. Supporting facilities include site development, utilities and connections, Military Equipment Park (MEP), non-organizational parking, vehicle wash rack platforms, bi-level equipment loading ramp, circulation pavements, storm drainage, paving, walks, curbs and gutters, fencing, gates, lighting, information systems, landscaping, and signage. Accessibility for the disabled will be provided. Anti-terrorism Force Protection (ATFP) and physical security measures will be incorporated into the design including maximum standoff distances from roads, parking areas and vehicle unloading areas. Sustainability and Energy measures will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoDs Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Estimated Construction Cost is betw een $25,000,000.00 and $100,000,000.00. The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com.

Award

Military

$45,998,150.00

Public - Federal

New Construction, Site Work

700

39

134

7

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2025

December 8, 2025

Project location map

To Be Determined, Birmingham, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.