BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a multi-residential development in Tulalip, Washington. Completed plans call for the renovation of a multi-residential development.

The project includes, but is not limited to the following: general, civil, plumbing, mechanical, electrical construction. Each proposal must be submitted on the prescribed forms and accompanied by a cashiers check, certified check or bid bond executed on the prescribed form, payable to Tulalip Tribes of Washington in an amount not less than five percent (5%) of the amount of bid. This work includes but is not limited to the furnishing, delivering, installing, testing and placing into successful operation the work specified herein and shown on the drawings. Electrical drawings do not show complete details of building construction, and this Contractor shall refer to architectural plans for details and furnish equipment and labor to provide a complete and operating system. Work shall include, but is not limited to: 1. Underground 120/240V, single phase service including underground conduit system for primary feeders to transformers and secondary feeders to meter centers. 2. Any vaults as required by the Local Utility Company. 3. Secondary feeders from transformers to meter centers 4. Trenching, mandrel proofing, and backfilling as required by the Local Utility Company. 5. Coordination with the Local Utility Company for transformer locations and primary routing. 6. Meter Centers with exterior metering and circuits breakers to meet the requirements of serving Utility Company. 7. Branch circuit and power circuit conduits and wiring, including outlets, service connections, switches, connections to mechanical equipment, etc. 8. Telephone system, including conduit and wiring from telephone pedestal to main telephone cabinet for each apartment building. Provide media cabinet in each tenant apartment wired from main apartment building cabinet. 9. TV System including boxes, outlets, wiring and raceway. 10. Smoke and CO detectors in units. 11. Provide manual transfer switch and generator hook-up plug in base bid for all units. All Work in this Contract shall be substantially complete within 365 consecutive calendar days from the Notice to Proceed. Extensions may be granted due to conditions beyond the control of the Contractor or his Subcontractors. Validity of such conditions shall be determined solely by the Architect. The Owner intends to issue A Notice to Proceed (NTP) with construction on or about April 1, 2025.)

GC Bidding

Multi-Residential

$150,000.00

Public - State/Provincial

Renovation

82

22

10

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
10
Bidding Soon
1,196
All Active Projects
491
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2025

April 1, 2025

img_map_placeholder

To Be Determined, Tulalip, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.