Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Sacramento, California. Completed plans call for the renovation of a educational facility.
Replacement of existing electrical switchgear with new electrical switchgear. Reconfiguration and coordination to ensure proper installation. Scope of Work includes but is not limited to: Replacement of existing electrical switchgear with new electrical 6 switchgear. Reconfiguration and coordination to ensure proper installation 7 8 9 Included: 10 11 1. Furnish and install all labor, material and equipment for all Work shown and/or specified in accordance with 12 the Contract Documents, except as excluded below. 13 2. This Scope of Work also applies to all applicable awarded alternates. 14 3. Information provided under "Also Included" points out some items which may be considered less obvious or 15 "unconventional," but which are included in the Scope of Work. 16 4. This Bid Package Description is intended to clarify scope to the Contractor, but is in no way intended to limit 17 scope that is reasonable inferable as being required by the Work included in this description. Work required 18 may be shown or specified anywhere in the Contract Documents. 19 20 Also included but not limited to as applicable and/or directed: 21 22 1. Trenching/compaction and backfill Work. 23 2. Concrete/asphalt patching Work. 24 3. All demolition and removal and/or replacement of Work associated with this Bid Package. 25 4. Perform an electronic underground existing utility survey by a qualified underground utility locator service 26 company in all areas where trenching operations will be performed. An as-built record drawing (one hard 27 copy and one copy on electronic media prepared in AutoCAD is required to be submitted at the conclusion of 28 the underground scope of Work. 29 5. Weather protection during the course of construction (See Section 00 72 00, General Conditions). 30 6. Temporary barricades, signs, pedestrian protection, temporary facilities and traffic control Work. 31 7. Daily and final clean-up is required8. Qualified/certified technicians must perform the replacement and/or repair of all landscape, irrigation, 33 asphalt/concrete surfaces and above or below grade utilities disturbed during construction, and the District 34 must be given the opportunity to test and accept the Work prior to covering up. 35 9. Patching, repairing, painting and/or replacement of all finished surfaces disturbed during construction. 36 10. Final testing of all systems installed prior to final acceptance. 37 11. Qualified/certified C-7 licensed technicians must perform the replacement and/or repair of existing low voltage 38 systems disturbed during construction, and the District must be given the opportunity to test and accept the 39 Work prior to covering up. 40 12. Provide temporary means of operation for existing storm, water, sewer, gas, mechanical, electrical, and low 41 voltage systems during construction. 42 13. Painting of all new (N) and existing (E) exposed interior and exterior piping, ductwork and raceway systems 43 (other than rooftop piping and raceway systems), and all roofing demolition, repair, replacement, roof 44 patching, sheet metal flashing. 45 14. A full-time superintendent shall be provided for the project. See Section 00 72 00, General Conditions. 46 15. Any campus utility interruptions require a minimum of a 48-hour notice to the District Representative for 47 coordination purposes. 48 49 Excluded: 50 1. Permits. 51 2. Fees. Question Deadline 01/09/2025 at 10:00 AM PT
Sub-Bidding
Educational
$175,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 17, 2025
February 7, 2025
9045 Canberra Dr, Sacramento, CA
Related To This Project
Sacramento, CA
Bid Date: Jan 17 2025
Sacramento, CA
Bid Date: Jan 08 2025
Sacramento, CA
Bid Date: Jan 06 2025
Sacramento, CA
Bid Date: Jan 14 2025
Sacramento, CA
--
Sacramento, CA
--
Sacramento, CA
--
Sacramento, CA
Bid Date: Dec 23 2024
Sacramento, CA
Bid Date: Dec 10 2024
Sacramento, CA
Bid Date: Dec 10 2024
Sacramento, CA
Bid Date: Jan 06 2025
Sacramento, CA
Bid Date: Dec 12 2024
Sacramento, CA
Bid Date: Dec 18 2024
Sacramento, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.