BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 17, 2025 at 8:00 PM

Updated June 18, 2025

Demolition, site work and new construction of a mixed-use development in Burlington, Massachusetts. Completed plans call for the demolition of a water / sewer project; for site work for a water / sewer project; for the construction of a fire / police facility; and fire / police facility.

Renovation and repurpose of a former water treatment facility located at 171 Middlesex Turnpike, Burlington, MA 01803. Within the existing building, completely demolish and remove the following existing water treatment equipment including but not limited to: water storage vessels, process piping, control panels & associated conduits, housekeeping pads/pipe supports. Once demo is complete, construction of a new offices for the Temporary Burlington Police Department consisting of administrative offices, communication equipment room, meeting room, storage, toilet room renovations, roll call, report writing and interview rooms. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The estimated construction cost for this Project is $1,750,000. Requests for interpretation must be submitted by email. Every request for such interpretation should be in writing addressed to the attention of both Mr. Kevin Witzell at Kaestle Boos Associates, Inc, 16 Chestnut Street, Suite 301, Foxborough, MA 02035 at kwitzell@kba-architects.com and Mr. David Hurley at CHA, 1 Washington Mall, Boston, MA 02108 at dhurley@chasolutions.com , respectively. Email requests shall include a subject heading that clearly identifies

Bid Results

Fire / Police

$1,835,000.00

Public - City

Demolition, New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
565
Active Projects
255
Bidding Soon
3,921
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2025

June 18, 2025

Project location map

171 Middlesex Turnpike, Burlington, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.