Site work for a civil project in Burlington, Massachusetts. Completed plans call for site work for a road / highway; and water / sewer project.
Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Installation of approximately 600 feet of six inch watermain, new service connections and other watermain materials, in Marion Road, Burlington, MA The work under this contract will include all equipment, labor, material, supplies, etc. necessary to furnish the work described in this contract. All materials used must comply with the current Town of Burlington Street Opening Rules and Regulations. Work under this contract will include the installation of approximately 600 feet of six (6) inch zinc coated class 52 cement line ductile iron watermain in Marion Road. This new main will replace an existing six (6) inch asbestos cement main. Work will commence at a new eight (8) inch by six (6) inch tee, with the new tee being cut into the existing eight (8) inch asbestos cement main in Carey Avenue. A triple gated system will be installed on the new tee in Carey Avenue, with two (2) new eight (8) inch gate valves being installed upstream and downstream, and one (1) new six (6) inch gate valve off of the branch of the tee for Marion Road. The through branch of the tee and eight (8) inch gates will be placed into service upon completion of the work, and the six inch gate for Marion Road will remain CLOSED for pressure and disinfection testing. Starting at the new tee in Carey Avenue, the proposed six (6) inch main will continue westerly down Marion Road, as depicted upon the plan set, terminating at a new hydrant adjacent to the driveway of house number five (5) Marion Road. Each residential water service will be replaced with new one (1) inch type K copper tubing, including a new Muller open left, or approved equal, one (1) inch curb stop. The means of connecting to existing services will be made/determined in the field based upon the size and material encountered in the field. A new future water service will be installed on the western side of the driveway of number four (4) Marion road, as depicted upon the plan set/as directed by the Engineer. The new service line will be terminated in a new curb stop, to be buried in the off position and the corporation tap, to be buried in the on position. The existing hydrant in front of number one (1) Marion Road will be replaced with a new Clow Eddy with drain port, model number F-2640, and six inch gate valve, and a new hydrant will be installed adjacent to number five (5) Marion Road, as previously stated. Once the new main in Marion is tested and in service, the existing main connection at the intersection of Marion Road and Carey Avenue, will be excavated, and the existing tee and gate removed and replaced with a new possible eight (8) inch to six (6) inch reducer if necessary, length of appropriately sized pipe cement line ductile iron pipe, and dresser couplings, installed to replace the old connection. At the same time the existing six (6) inch main in Marion Road will be abandoned in place and cut and capped. The intention is to keep the existing six (6) inch main live during the installation of the new main, keeping water service to all residents and hydrant. No temporary water is proposed as part of this project.
Bid Results
Water / Sewer
$215,990.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 3, 2025
April 28, 2025
Marion Rd, Burlington, MA
Related To This Project
Burlington, MA
Bid Date: Feb 21 2025
Burlington, MA
Bid Date: Feb 26 2025
Burlington, MA
Bid Date: Feb 21 2025
Burlington, MA
Bid Date: Mar 05 2025
Burlington, MA
Bid Date: Feb 24 2025
Burlington, MA
Bid Date: Mar 12 2025
Burlington, MA
Bid Date: Mar 26 2025
Burlington, MA
Bid Date: Mar 12 2025
Burlington, MA
--
Burlington, MA
--
Burlington, MA
--
Burlington, MA
Bid Date: Jan 15 2025
Burlington, MA
Bid Date: Dec 23 2024
Burlington, MA
Bid Date: Jan 17 2025
Burlington, MA
Bid Date: Dec 30 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.