Site work for a water / sewer project in Saint Paul Island, Alaska. Completed plans call for site work for a water / sewer project.
The of Alaska, Department of Environmental Conservation, Village Safe Water Program (department) is soliciting an Invitation to Bid (ITB) for a contractor to construct the lift station project in the City of Saint Paul, Alaska. All work shall be completed by: Substantial completion: 12/31/2025 Final Completion: 6/30/2026 The Department will identify interim completion dates, if any, in the Special Provisions. Scope of Work: The contractor shall construct two new lift stations to replace the existing Sandy Lane and Ellerman Heights lift stations in Saint Paul, Alaska as shown in the attached plans and specifications. The work includes: o Construction of two new concrete wetwells including all associated piping, mechanical, and electrical components, o Construction of force and gravity sewer mains for the new lift stations to be connected to the existing sewer system, o Construction of new lift station buildings, including building pad, concrete footings, connection to the well, all associated site work, piping and all mechanical and electrical components, o Demolition of the existing lift stations and force and gravity mains. The contractor is responsible for all labor, materials, disposal and equipment to complete the work. The community has a permitted class III landfill. However, the community may not have the capacity to accommodate the disposal of debris from this construction project. The contractor shall be responsible for removal and the disposal of all associated debris in accordance with applicable waste management regulations. The contractor shall provide all construction project management for successful completion of the work. Tasks include but are not limited to submittals, project schedules, project meetings, requests for information, labor and subcontractor coordination and coordination with the construction administrator, project engineer and inspector(s). The Work will require the contractor to abide by all permit stipulations outlined in the Contract Documents The apparent successful bidder must furnish a payment bond in the amount of 100% of the contract and a performance bond in the amount of 100% of the contract as security conditioned for the full, complete and faithful performance of the contract. The apparent successful bidder must execute the said contract and bonds within fifteen calendar days, or such further time as may be allowed in writing by the Contracting Officer, after receiving notification of the acceptance of their bid. To be responsive, a bid must include a bid guaranty equal to 5% of the amount bid. (When calculating the bid amount for purposes of determining the 5% value of the bid guaranty, a bidder shall include its base bid amount, plus the amount bid for alternate and supplemental bid items, if any.) The Engineer's Estimate is between $1,000,000 and $2,500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions Prior to the Deadline for Receipt of Bids: All questions shall be addressed in writing and directed to the Procurement Officer. The deadline for submission of questions is 10 days prior to the ITB deadline. This will allow time for an addendum to be issued if one is required. It will also help prevent the opening of a defective proposal. No questions other than written shall be accepted and no response other than written will be binding upon VSW, an addendum will be published and issued to all offerors by email. Question Deadline 12/27/2024
GC Bidding
Water / Sewer
$2,500,000.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 8, 2025
March 10, 2025
To Be Determined, Saint Paul Island, AK
Related To This Project
Saint Paul Island, AK
--
Saint Paul Island, AK
Bid Date: Sep 05 2023
Replacement of Above Ground Fuel Storage Tanks at NOAA Facilities in St Paul and St George - 5070082
Saint Paul Island, AK
Bid Date: Jun 02 2023
Saint Paul Island, AK
Bid Date: Aug 08 2024
Saint Paul Island, AK
Bid Date: May 17 2019
Saint Paul Island, AK
Bid Date: Mar 26 2021
Kodiak, AK
Bid Date: Dec 12 2024
Fairbanks, AK
Bid Date: Jan 17 2025
Fairbanks, AK
Bid Date: Jan 17 2025
Juneau, AK
Bid Date: Jan 09 2025
Fairbanks, AK
Bid Date: Jan 09 2025
Quinhagak, AK
Bid Date: Dec 26 2024
Kenai, AK
--
Valdez, AK
Bid Date: Dec 17 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
New Year, New Possibilities. Make the connections you need to kickstart 2025.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.