BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 11, 2025 at 7:00 PM

Updated December 12, 2025

Site work, paving and new construction of a bridge / tunnel in Tustin, California. Conceptual plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Design and construction of a pedestrian bridge over Armstrong Avenue. This project is part of the Tustin Legacy Backbone Infrastructure Program. This project will be designed in conjunction with the Tustin Legacy Park in Neighborhood D South, the Warner Avenue pedestrian bridge, and Neighborhood D South Phase 2 Improvements to address overlapping infrastructure elements. The pedestrian bridge will be split into two phases. The first phase will include rough grading, surcharge, and establishment of the structural mounds. The second phase will include final improvements associated with the bridge. This project is included in the City of Tustin's FY 2025-2030 Capital Improvement Program (CIP). As of December 11, 2025, information regarding a design team or a general contractor is not available. A firm timeline for construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Bridges / Tunnels

$6,253,700.00

Public - City

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

Project location map

Armstrong Ave, Tustin, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.