BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 28, 2025 at 7:00 PM

Updated March 1, 2025

Renovation of an educational facility in Pflugerville, Texas. Completed plans call for the renovation of a educational facility.

As of February 28, 2025, project was awarded to Braun & Butler Construction, but awarded amount is not available. Vendor Questions Due January 7, 2025 @ 5:00 pm 1. The Pflugerville Independent School District ("PfISD" or "District") is soliciting competitive sealed proposals for general construction services of a General Contractor for the turnkey replacement of PACE Wood Shop HVAC & Control System, pursuant to Chapter 2269 of the Texas Government Code. The awarded firm will be expected to provide services in accordance with specifications and conditions embodied within this document. 2. This project will include the complete replacement of HVAC systems at two campuses. 3. This project comes with an estimated budget of PACE Wood Shop - $ 150,000 4. PfISD believes the information included in this RFCSP is materially accurate, however, the PfISD does not warrant this information to be free from errors or omissions. Proposers are encouraged to inspect the premises prior to submitting a response. 5. The district is working with the following design firms: ESA 806 W. Main Street, Box 39 Atlanta, Texas 75551 6. Upon approval of the rankings by the Board of Trustees, the District's representative will attempt to negotiate a contract with the selected Proposer. If the prices proposed are more than the District's budget for the Project, the Owner's representative may discuss with the selected Proposer options for scope or time modifications and any price change associated with the modification. If the representative is unable to reach a contract with the selected Proposer, the representative may formally end negotiations with that Proposer and proceed to the next ranked Proposer in the order of the selection ranking until a contract is reached or all proposals are rejected. 7. The district intends to obtain final completion by August 1, 2025. This project comes with an estimated budget of: PACE Wood Shop - $ 150,000. PACE High School Wood Shop HVAC & Control System

Award

Educational

$150,000.00

Public - City

Renovation

7

4

6

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
300
Active Projects
125
Bidding Soon
2,660
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2025

March 1, 2025

Project location map

700 W Pecan St, Pflugerville, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.