BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2025 at 7:00 PM

Updated February 5, 2025

Renovation of an educational facility in Alexandria, Louisiana. Completed plans call for the renovation of a educational facility.

For: Boiler Replacement at Alexandria Senior High School (BID NO. 62-25-04) After stamping to acknowledge timely receipt, the bids will be publicly opened and read by the Executive Committee and/or staff of the Rapides Parish School Board. Sole responsibility for proper delivery of bid is that of the bidder. Any offer received after closing time (11:00 AM, Thursday, January 16, 2025) will be returned unopened. All bids must be accompanied by an original bid security equal to five (5%) of the total amount bid and must be in the form of a Certified Check, Cashiers Check, Bank Money Order or Bid Bond written by a company licensed to do business in the State of Louisiana. Subject to the provisions of R.S. 38:2211, et seq., the Rapides Parish School Board reserves the right to reject any or all bids for just cause. Each bidder, shall submit with their bid satisfactory evidence that they have complied with the requirements of the LA Contractor's Licensing Law, Louisiana R.S. 37:2150, et seq., and are fully qualified to enter into contract with the Rapides Parish School Board. Bid envelopes shall be marked "Boiler Replacement at Alexandria Senior High School Bid # 62-25-04, Contractors Name and Contractors License Number and delivered to: Purchasing Department Rapides Parish School Board 619 Sixth Street Alexandria, Louisiana 71301 1. All parts of the BID package (including the drawing(s), specifications, and Work Requirements)arecomplementary. What is required by one part shall be as if required by all parts. 2. Contractor shall disconnect, remove and properly dispose of existing defective Aercoboiler #2thatisbeingreplaced and/or recycle same in accordance with federal, state, and local rules, regulations, andstatutes(e.g.spoilage becomes property and responsibility contractor). 3. Contractor shall supply and install (1) OEM Replacement Aerco Boiler Model Number BMK2000. AnyReplacement Boiler other than OEM Replacement Model Aerco Boiler MUSTbe pre-approvedandwillberequired to meet the specifications below: A. 439 Stainless Steel Heat Exchanger with Single Inlet B. Fault Mode Diagnostic Panel with Digital Readout C. Gas Train in Accordance with CSD-1 D. 15:1 Modulating Air/Fuel Valve E. Ability to Communicate with other Aerco "Edge" Controllers thru AercoBMSNetwork4. Contractor shall verify existing conditions and dimensions prior to submitting a bid. Dimensionsmustbefield verified prior to submitting a bid. 5. Contractor shall perform all work in compliance with all applicable local, state, andnational codesandordinances. 6. Contractor shall install products and materials per manufacturer's requirements andrecommendations.7. Contractor shall be verified to be approved, authorized and/or licensed to install manufacturer'sproduct.8. Contractor shall reconnect boiler to existing electrical and hot water piping. Any andall modificationsmustbe included. 9. Contractor shall provide all required permits. 10. Contractor shall legally dispose of all trash, debris, and waste materials offsite and/or recyclesameinaccordance with federal, state, and local rules, regulations, and statutes (e.g. spoilage becomespropertyandresponsibility of contractor). 11. Contractor shall clean the work site and surrounding areas impacted by constructionoperationstopre-workconditions or better. 12. Contractor shall include 1 year full contractor's warranty, as well as applicable manufacturer'swarranties.13. Contractor shall provide all labor, materials, equipment, hardware, accessories, andincidentalsasnecessaryfor a complete and fully functional system. 14. The owner has no intention that any of this work should disturb asbestos containing materials or that anynewmaterials should contain asbestos. The contractor shall review the Asbestos Management Planfor thisfacilityprior to commencing work. 15. All personnel connected to this work shall dress and behave in a positive manner appropriatefor aRPSBfacility.Negative conditions such as loud music, smoking, weapons, offensive language, or inappropriatecontactwithstudents or staff are strictly prohibited.

Award

Educational

$79,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
37
Bidding Soon
508
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2025

February 17, 2025

Project location map

800 Ola St, Alexandria, LA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.