BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2025 at 8:00 PM

Updated March 12, 2025

Renovation of a water / sewer project in Chazy, New York. Completed plans call for the renovation of a water / sewer project.

**As of February 18, 2025 the project has not been awarded yet. The timeline for award has not yet been established.** The Project includes the following Work: The proposed project is to include the implementation of UV Disinfection equipment located in a new building (~1,092 sq. ft.) that will also house new filtration equipment on the southern side of the site. The capital project will also include a new SCADA system, address freezing issues, and general equipment and existing building upgrades. Question Deadline 01/07/2025 A. Work of the overall Project includes the following major components: 1. General Construction (GC): The contract involves work at the Owner's Wastewater Treatment Facility including, but not limited to, providing construction of a new Tertiary Treatment Building for effluent filtration and ultraviolet light disinfection, demolition of the existing Filter Building, equipment and structural upgrades in the existing treatment tanks, site piping, site cut, fill, and grading, paving, and miscellaneous site and building improvements. 2. Electrical (E): The contract includes providing site and building power and control conduit, wiring, and terminations, electrical demolition, and associated work at the Owner's Wastewater Treatment Facility. Work generally includes power and control conduit, wiring, and terminations in the new Tertiary Treatment Building; electrical demolition, upgrades, power and control conduit, wiring, and terminations in the existing Control Building; site power and control wiring for lighting, equipment, and instrumentation; new submersible pumps in all process tanks and associated power and controls; a new facility-wide SCADA system and associated instrumentation and equipment (both existing and new); electrical demolition of the existing filtration building and equipment; and miscellaneous improvements. 3. Plumbing/Process (P): The contract includes work at the Owner's Wastewater Treatment Facility including, but not limited to, demolition of existing process and plumbing systems, providing an effluent filtration system and an ultraviolet light disinfection system, providing a SCADA control system and associated equipment and instrumentation, providing process and plumbing piping, valving and supports, providing building water, sanitary, LPG, and miscellaneous work and improvements. 4. Mechanical (M): The contract includes work at the Owner's Wastewater Treatment Facility including, but not limited to, demolition, improvements, construction, and upgrades of the existing mechanical systems at the Control Building and construction of new mechanical systems at the Tertiary Treatment Building. B. Perform Work of this Contract with Owner in accordance with Conditions of Contract. C. Work of Contract is identified in the following articles: 1. Contract (GC) - General Construction: Provide work identified in Specifications and Drawings, generally consisting of G, C, S, and A Drawings, and in Specifications Division 00 through Division 01, Division 03, Division 05 through Division 10, Division 31 through Division 33, and Division 43, except work specifically identified as not in contract (NIC) or assigned to another contractor or the Owner. Refer to entire drawing set for Work and coordination items. Note: Contract (GC) may be indicated as "G.C.", "GENERAL CONTRACTOR," "GC," or "G" on drawings. 2. Contract (E) - Electrical: Provide work identified in the Contract Drawings, and in Specifications Division 00, Division 01, Division 26, and Division 27, except work specifically identified as not in contract (NIC) or assigned to another contractor or the Owner. Refer to entire drawing set for Work and coordination items. Note: Contract (E) may be indicated as "E.C.," "EC," "ELECTRICAL CONTRACT(OR)," or "E" on drawings. 3. Contract (P) - Plumbing/Process: Provide work identified in Specifications and Drawings, generally consisting of G, W, and P Drawings, and in Specifications Division 00, Division 01, Division 09, Division 22, Division 40 and Division 46, except work specifically identified as not in contract (NIC) or assigned to another contractor or the Owner. Refer to entire drawing set for Work and coordination items. Note: Contract (P) may be indicated as "P.C.," "PC," "PLUMBING CONTRACT(OR)" or "P" on drawings. 4. Contract (M) - Mechanical: Provide work identified in Specifications and Drawings, generally consisting of G and M Drawings, and in Specifications Division 00, Division 01, and Division 23, except work specifically identified as not in contract (NIC) or assigned to another contractor or the Owner. Refer to entire drawing set for Work and coordination items. Note: Contract (M) may be indicated as "M.C.," "MC," "MECHANICAL CONTRACTOR," or "M" on drawings. A. Work included: Provide all facilities and traffic controls needed to allow safe conduct of the work while maintaining public use of the site, including, but not necessarily limited to: 1. Warning signs, barricades, delineators, lights, cones, etc. 2. Flaggers with appropriate signs and ability to direct traffic through the work site. B. Traffic control shall be the sole responsibility of the Contractor. Custom Bid Tabulation Project Branon Construction General Construction (GC) $ 2,404,000 Triangle Electric Electrical (E) $ 339,700 Pipeline Mechanical Mechanical (M) $ 85,000 Pipleline Mechanical Plumbing/Process (P) $1,399,500

Award

Water / Sewer

$1,399,500.00

Public - City

Renovation

77

34

50

9

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
16
Bidding Soon
1,882
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2025

May 8, 2025

Project location map

To Be Determined, Chazy, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.