BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Statesboro, Georgia. Completed plans call for the renovation of a educational facility.

ase Bid: The scope of work includes the removal of the entirety of all flooring, to include existing Omnisports vinyl flooring and the poured-in-place urethane pad adhered to the concrete slab. New flooring shall be installed consisting of Tarkett Tarkolay moisture barrier slip sheet and Omnisports Active + 8.1 mm vinyl flooring in golden maple. The slip sheet under all load bearing areas (under retractable bleachers) shall be adhered to the concrete slab using a multi poxy adhesive with a relative humidity (RH) of not less than 98%. The Omnisports vinyl flooring shall be adhered to the slip sheet throughout the entire floor using the same multi poxy adhesive. Existing retractable bleachers are to be removed by the contractor, including both home and visitor sides ( 2 sides) and re-installed after replacement flooring is installed. Alternates to the flooring specified in section may be considered by Owner, provided that they are of a similar quality, construction, standard, and specification. Suppliers of private label flooring for this project must identify themselves as such and fully disclose the OEM information. All manufacturer requirements in these specifications must be complied with by the OEM, including warranties, certifications, qualifications, product data, test results, environmental requirements, performance data, etc. Alternate No. 1 The scope of work includes all requirements/scope included in the base bid, except that the main court shall be golden maple and the entire surrounding flooring shall be blue. Game lines shall be painted on replacement flooring to match all existing game lines at William James Middle School and Langston Chapel Middle School. Questions related to this RFQ must be submitted in writing by email to Ryan Macy, Director of Facilities Management (rtmacy@bullochschools.org). Responses to questions will be shared via email with all contractor emails listed on the sign in sheet at the mandatory pre-bid meeting. Questions asked prior to the pre-bid meeting will be shared in writing with all attendees at the time of the pre-bid meeting. The gyms are located at: William James Middle School 18809 Hwy 80 West, Statesboro, Georgia 30458 Langston Chapel Middle School 156 Langston Chapel Road, Statesboro, Georgia 30458

Sub-Bidding

Educational

$230,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
11
Bidding Soon
364
All Active Projects
143
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 22, 2025

February 21, 2025

img_map_placeholder

Multiple Locations, Statesboro, GA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.