Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 23, 2025 at 8:00 PM
Updated July 24, 2025
Site work, paving, outdoor lighting and new construction of a civil project in Austin, Texas. Working plans call for the construction of a bridge / tunnel; for paving for a bridge / tunnel; for site work for a water / sewer project; road / highway; road / highway; and for outdoor lighting for a road / highway.
Estimated Amount for Solicitation: $5,800,000.00. Federal Aid Project Number: DMO 2025(766) SUB PROJECT ID: 13258.002 Question Deadline 07/08/2025 Prospective Bidders desiring further information or interpretation of Project Manual or Drawings must make a written request for such information to OWNER addressed to the Authorized Contact Person Project/SolicitationNumber: IFB 6100 CLMC1107A, 2023-307, TxDOT CSJ 0914-04-344 Project Description: This Project Is a Federally and City-Funded Capital Improvements Project (Cip) by the Transportation and Public Works (Tpw) Department of The City of Austin for 274 Lf of a 12-Ft Wide Concrete Urban Trail and 225 Lf of a Prefabricated Metal Pedestrian Bridge From the Intersection Of Sellers St. And Gunter St. East Over Boggy Creek to Lyons Rd. Just South of the Capital Metropolitan Transportation Authority (Capmetro) Railroad Row Located on City Row and City Property. The Work consists of 225 linear feet of 13'-4" wide by 10'-0" tall clear opening Prefabricated Steel Pedestrian Bridge spanning Boggy Creek; approximately 274 linear feet of 12'-0" wide concrete, urban trail; trail lighting; grading; pavement repair; drainage modifications; and all necessary appurtenances. BID GUARANTY All Bids shall be accompanied by an acceptable Bid guaranty in an amount of not less than five percent (5%) of the total Bid, as specified in Section 00100, Instructions to Bidders. BONDS AND INSURANCE Performance and payment bonds when required shall be executed on forms furnished by OWNER. Each bond shall be issued in an amount of one hundred percent (100%) of the Contract Amount by a solvent corporate surety company authorized to do business in the State of Texas, and shall meet any other requirements established by law or by OWNER pursuant to applicable law. WAGE COMPLIANCE Minimum wage rates have been established and are specified in Section 00830, Wage Rates and Payroll Reporting. CONTRACT TIME Contract Time is of the essence and all Work shall be substantially completed within Two Hundred Seventy (270) Calendar Days after date specified in the Notice to Proceed, in accordance with the Bid Form, Section 00300. Final completion shall be achieved within Thiry (30) Calendar Days after substantial completion. Estimated Amount for Solicitation: $5,800,000.00 The persons listed below may be contacted for information regarding the Invitation for Bid. PROJECT MANAGER: Ana Seivert, AICP, ENV SP Phone: 512-974-3566 Email: ana.seivert@austintexas.gov CAPITAL CONTRACTING CONTACT: Steve Cocke, CPPB Phone: 512-974-7998 Email: steven.cocke@austintexas.gov SMALL & MINORITY BUSINESS RESOURCES DEPARTMENT CONTACT: Donna Powell-Maddox, CTCD, CTCM, CCA Phone: 512-974-6668 Email: Donna.Powell-Maddox@austintexas.gov Liquidated damages are two thousand two hundred eighty dollars ($2,280.00) per Calendar Day for failure to substantially complete the work and one thousand six hundred ten dollars ($1,610.00) per Calendar Day for failure to achieve final completion within Thirty (30) Calendar Days after substantial completion, in accordance with the Bid Form OWNER reserves the right to reject any or all Bids and to waive any minor informality in any Bid or solicitation procedure (a minor informality is one that does not affect the competitiveness of the Bid).
Final Planning
Bridges / Tunnels
$3,421,877.00
Public - City
New Construction, Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 17, 2025
December 1, 2025
3615 Lyons Rd, Austin, TX
Related To This Project
Austin, TX
Bid Date: Apr 03 2025
Austin, TX
Bid Date: Mar 20 2025
Austin, TX
--
Austin, TX
Bid Date: Feb 24 2025
Austin, TX
Bid Date: Feb 11 2025
Austin, TX
--
Austin, TX
--
Austin, TX
Bid Date: Apr 10 2025
Austin, TX
--
Austin, TX
Bid Date: Apr 01 2025
Austin, TX
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
