BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 25, 2026 at 8:00 PM

Updated March 26, 2026

Demolition, site work and new construction of an educational facility in Wikwemikong, Ontario. Working plans call for the construction of a 81,245-square-foot, two-story above grade, 32-room educational facility; for site work for a educational facility; and for the demolition of a educational facility.

Construction of facilities to accommodate Kindergarten to Grade 8 students 32 full-size classrooms, including 5 kindergarten classrooms special needs area of at least 888 sq m on Manitoulin Island. -Designated space for teachers to work, meet and prepare programs. -Detached medicine lodge/gathering space to conduct traditional community teachings and ceremonies. -Large-scale gymnasium with sliding partition wall, stage, bleachers and elevated running track to support physical education and special occasion activities. -Commercial kitchen with space for walk-in fridge and freezer and cafeteria amenity. -Designated space for a small micro-hatchery (the size of a small desk). -Mechanical Services floor (facility and associated works) with loading zone and storage area. -A multi-floor GFA of approx. 7,522 sq m. -Associated water, sanitary, HVAC Systems, building security, telecoms, internet, and electrical power for the facility. -Site Servicing including water, sanitary, electrical power, fiber-optics, telecoms, access road, lighting, and parking areas to service the new school site. -A skyway or skybridge that will connect the new school to a detached building supported by the Wiikwemkoong Health Department. -Decommissioning and demolition of the existing Youth Centre. -Building decommissioning and demolition of the existing Wasse Abin Pontiac School. -Decommissioning and demolition of the existing Wasse Abin Junior School. TIMELINE: Detailed designs are underway. Current tender timeline: approx. February 2027. Current construction timeline: approx. April 2027. Further update summer/fall 2026. *Architects are working in joint-venture.

Final Planning

Educational

$23,000,000.00

Public - Federal

Demolition, New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
0
Bidding Soon
58
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2027

Project location map

2235 Wikwemikong Way, Wikwemikong, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.