BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 12, 2025 at 8:00 PM

Updated March 13, 2025

Renovation of a mixed-use development in Newburgh, Indiana. Completed plans call for the renovation of a educational facility.

Tecumseh Middle School- Replace (1) existing heating only AHU located within the Auxiliary Gym and outside air intake hood with (1) new RTU located on the roof located above the Auxiliary Gym. The School Corporation has already purchased this new RTU and it is scheduled to ship mid-February 2025. The existing supply ductwork inside the Auxiliary Gym is to remain but have external insulation and pvc jacketing added. Removal of existing unit electrical feed and replacement with new unit electrical feed. Removal of existing unit controls and replacement with new unit controls. Project Description: The 2025 Castle North Middle School Cafeteria and Tecumseh Middle School Auxiliary Gym HVAC Replacements Project includes work at (2) schools-Castle North Middle School and Tecumseh Middle School. Castle North Middle School- Replace (1) existing 90 ton RTU located on the roof above the Cafeteria with (1) new 90 ton RTU. The School Corporation has already purchased and is in the possession of the new 90 ton RTU. Removal of existing unit electrical feed and replacement with new unit electrical feed. Removal of all existing unit controls and replacement with new unit controls. Removal of (24) existing VAV terminal units and controls and replacement with (24) new VAV terminal units and controls. PROJECT LOCATIONS: Castle North Middle School 2800 IN-261 Newburgh, Indiana 47630 Tecumseh Middle School 5300 IN-68 Lynnville, Indiana 47619 Tecumseh Middle School- Replace (1) existing heating only AHU located within the Auxiliary Gym and outside air intake hood with (1) new RTU located on the roof located above the Auxiliary Gym. The School Corporation has already purchased this new RTU and it is scheduled to ship mid-February 2025. The existing supply ductwork inside the Auxiliary Gym is to remain but have external insulation and pvc jacketing added. Removal of existing unit electrical feed and replacement with new unit electrical feed. Removal of existing unit controls and replacement with new unit controls. Question Deadline 01/09/2025 Bidders and Sub-bidders requiring clarification or interpretation of the Bidding Documents shall make a written request which shall reach the Architect up to five days prior to the date for receipt of Bids and shall be directed to Gordon Klaus at the office of Three I Design, 2425 West Indiana Street, Evansville, Indiana 47712, Main office- (812) 423- 6800; Direct- (812) 422-8816; e-mail: gklaus@threeidesign.com

Award

Educational

$300,000.00

Public - County

Renovation

26

9

5

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
0
Bidding Soon
353
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2025

February 3, 2025

Project location map

Multiple Locations, Newburgh, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.