Published February 24, 2025 at 7:00 PM

Updated October 1, 2024

Demolition, site work, renovation and addition to an educational facility in Rochelle, Illinois. Completed plans call for the addition of a 16,260-square-foot, one-story above grade educational facility; for the demolition of a educational facility; for the renovation of a 32,796-square-foot educational facility; and for site work for a educational facility.

https://rochellenews-leader.com/stories/elementary-school-board-142-million-bid-for-tilton-school-construction-project-approved,83659? Elementary school board: $14.2 million bid for Tilton School construction project approved Discussion held on potential future preschool programming at May Elementary School At its monthly meeting Tuesday, the Rochelle Elementary School District Board of Education unanimously approved a $14.237 million bid from Stenstrom Construction for an upcoming construction project that will renovate and expand the footprint of Tilton Elementary School. At its monthly meeting Tuesday, the Rochelle Elementary School District Board of Education unanimously approved a $14.237 million bid from Stenstrom Construction for an upcoming construction project that will renovate and expand the footprint of Tilton Elementary School. Jeff Helfrich Posted Thursday, February 13, 2025 11:55 am By Jeff Helfrich, Managing Editor ROCHELLE — At its monthly meeting Tuesday, the Rochelle Elementary School District Board of Education unanimously approved a $14.237 million bid from Stenstrom Construction for an upcoming construction project that will renovate and expand the footprint of Tilton Elementary School. The Stenstrom Construction bid was the lowest the district received. The work will begin this summer and be completed in phases through the summer of 2026. At its meeting in June, the board unanimously approved a resolution to issue a maximum of $11,163,432 in general obligation school bonds for renovations at Tilton School and possible future work at its other schools. The bid approval was the culmination of a months-long process of preparing for the Tilton work. The district previously estimated the project would cost $14-16 million. In recent years it found in a health life safety evaluation that an estimated $7.9 million worth of work is required at the school for those issues. Health life safety concerns the physical safety of the building for students and staff to occupy. Tilton School was built in 1949. Along with funding from bonds, the district is utilizing $6-8 million from its reserves for other improvements involving security and spatial concerns including pick-up and drop-off areas. Some improvement work has already taken place at the school. For the Tilton School project as a whole, the district is tying in health life safety needs with recommended security enhancements and staff needs and wants, namely alleviating issues caused by limited space in the building. The district’s plans include a facelift of the existing building and additional space to be added in an expansion with additional classrooms, multi-purpose room, gym, library and music room space, ADA accessibility, technology and climate control. During the meeting the board also approved a $219,500 bid from Colfax Corporations for an asbestos removal project at Tilton School. The project will take place during spring break and over the summer and will be completed by the time school starts in the fall. The bid from Colfax Corporations was the lowest the district received. District Business Manager Kevin Dale said the project will remove asbestos in the entire building. Asbestos removal work was already done in "a couple" classrooms last year, Dale said. Preschool The board heard a report from District Assistant Superintendent Tony Doyle and Stepping Stones Preschool Director Yazmin Nambo on an idea to potentially expand the district's preschool offerings and utilize the currently-vacant May Elementary School building for that purpose. Stepping Stones Preschool, located inside Lincoln Elementary School, currently serves 180 students and has a waiting list of about 40 kids. The district has a desire to serve students on the waiting list and recently received a preschool-for-all grant for two years (fiscal year 2025 and fiscal year 2026) that made it consider expanding its offerings. May School at 1033 N. 2nd St. was closed by the school board before the 2021-2022 school year as the district shifted to an attendance center model due to declining enrollment and an increase in the district’s dual language program, which was previously only offered at Lincoln and Central Elementary Schools. The district was facing a half-full May School before the decision was made. The district has been holding meetings with stakeholders to determine what would be feasible and what would be required for preschool operations at May School. Nambo and Doyle said increased bathroom, playground, furniture, parking, safety and staffing needs would be among those that would have to be met for that to take place. There are currently six preschool classrooms at Stepping Stones Preschool and a seventh would be located at May School. A final recommendation will be brought to the board at its March meeting for potential preschool operations at May School this fall. "The grant has allowed us to open up our imaginations on how we could provide more services," District Superintendent Jason Harper said. "We know we have kids in our community who are looking for preschool services who are not able to receive those opportunities. Since we're at capacity here, that's led us to look at other ways we can provide these services. The natural place has been May School. It's not exactly a perfect fit and comes with some potential challenges between now and potentially opening in August and other potential challenges after that to continue to work through." _________________________________________________________________________________ Project Consists of a 16,260 square foot 1-story building addition and a 32,796 square foot renovation at the existing Tilton Elementary School building. Work includes, site work, storm water management, site utilities, asphalt, concrete, masonry, steel, roofing, exterior window systems, exterior doors systems, interior doors and frames, flooring, acoustical ceiling, paint, geothermal HVAC system, electrical, plumbing, fire protection and other Work indicated in the Contract Documents.

Award

Educational

$14,237,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
252
Active Projects
169
Bidding Soon
2,433
All Active Projects
1,052
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2025

February 21, 2025

img_map_placeholder

1050 N 9th St, Rochelle, IL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2025 Addition & Renovations at Tilton Elementary School

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.