Published February 25, 2025 at 7:00 PM

Updated February 26, 2025

Site work for a civil project in Georgetown, South Carolina. Completed plans call for site work for a water / sewer project.

The Pump Station #11 and Force Main Replacement consist of building a new replacement wastewater pump station and replacing a sewer force main. The work is divided into two (2) divisions. Construction Cost Range: 7.8M-18M PROJECT NO. 1049.2401 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PROJECT SUMMARY The Pump Station #11 and Force Main Replacement - Project #1820 & #1821 consists of building a new replacement wastewater pump station and sewer replacement force main, as generally described in Section 01 11 00 and as more fully described in the complete Bid Documents. The work will be divided into two (2) divisions as follows: Division I 1. One triplex submersible pump station (two (2) duty and one (1) back-up pump) operated with variable frequency drives (VFDs) and with a 12-foot x 20-foot castin-place concrete wet-well. 2. One building for enclosure of pump control panels and SCADA telemetry. Electrical / Controls Building designed to meet the City's architectural requirements. 3. Installation of emergency diesel generator. 4. All related yard piping, process piping, instrumentation, electrical equipment and wiring, and site improvements. 5. Installation of approximately 132 LF of 30-inch gravity, 184 LF of 15-inch gravity, and 18 LF of 12-inch gravity sewer. 6. Demolition of existing pump station once new pump station and force main is in operation. 7. Installation of approximately 95 LF of 20-inch restrained joint DIP force main. Division II 1. Installation of approximately 11,110 LF of 20-inch force main and appurtenances. The new force mains include 2,707 LF of 20-inch force main installed by horizontal directional drilling, and 865 LF of 20-inch and force main installed within steel casing. 2. Jack-and-bore installation of steel casing under one highway, two SCDOT roads, and three railroad crossings. 3. Installation of combination air/vacuum valves at regular intervals and system high points. This project will be partially funded with U.S. Department of the Treasury, American Rescue Plan, Coronavirus State and Local Fiscal Recovery Fund (SLFRF) grant funding under the South Carolina Infrastructure Investment Program (SCIIP) and managed by the Rural Infrastructure Authority (RIA). Therefore, certain restrictions and other Federal requirements attach to this opportunity. Bid Results Division 1 Moorehead Construction Inc - $6972555 Division 2 R H Moore - $3247960

Award

Water / Sewer

$3,247,960.00

Public - City

Site Work

81

30

5

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
50
Bidding Soon
664
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2025

March 31, 2025

Project location map

Multiple Locations, Georgetown, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.