EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 10, 2025 at 7:00 PM

Updated October 1, 2024

Site work and outdoor lighting for a water / sewer project in Battle Creek, Michigan. Completed plans call for site work for a water / sewer project; and for outdoor lighting for a water / sewer project.

**As of February 10, 2025, the project was awarded to Centennial Electric, LLC, with an awarded amount of $4,134,400.00.** Estimated project cost is $2 million. Description: The City of Battle Creek will accept sealed bids for the Verona Wellfield Power and Control Improvements Contract C project. This project consists of, but is not limited to, the installation of new conduit and conductors to provide power to the wellhouses in the Verona Wellfield. Additional work includes the installation of transformers, outdoor lighting, electrical equipment racks, conduit, and fiberoptic control cable to each of the existing Verona Wellfield wellhouses. BID BOND: Each bid must be accompanied by a standard form bid bond, made payable to the City of Battle Creek, in an amount of not less than five (5%) percent of the base bid submitted. Failure of any accepted bidder to enter into a contract for the work will cause forfeit of the bid security. We do not accept certified checks in lieu of bid bond. PERFORMANCE/LABOR/MATERIALS BONDS: The accepted bidder will be required to furnish a satisfactory performance bond and labor/materials payment bond, each in an amount equal to 100% of the contract and insurance certificate upon forms acceptable to the City. The City reserves the right to reject any or all bids and to waive any informalities and minor irregularities defects in bids. Bids may be withdrawn in person by a bidder, or authorized representative, provided their identity is made known and a receipt is signed for the bid, but only if the withdrawal is made prior to the time set for receipt of bids. Bids are an irrevocable offer and may not be withdrawn within 90 days after opening date and time. Liquidated Damages Failure of the Contractor to complete the work within the time allowed will result in damages being sustained by the City. Such damages are, and will continue to be, impracticable and extremely difficult to determine. Unless otherwise provided in the Special Conditions, the Contractor will pay to the City for the liquidated damages and not as penalty three thousand dollars ($3,000.00) for each calendar day of delay in finishing the work in excess of the time specified for completion, plus any Contractor will pay the City for the liquidated damages herein before mentioned are in lieu of the actual damages arising from such breaches of this contract; which said sums the City shall have the right to deduct from any monies in its hands, otherwise due, or to become due, to said Contractor or to sue for and recover compensation or damages for nonperformance of this Contract at the time stipulated herein and provided for. The attention of bidders is directed to the provisions and the General Conditions of contract requiring the Contractor to pay for all excess cost of field engineering and inspection as therein defined. Online Bid Opening Notes - Dial by your location o +1 305 224 1968 US o +1 309 205 3325 US o +1 312 626 6799 US (Chicago) o +1 646 931 3860 US o +1 929 205 6099 US (New York) o +1 301 715 8592 US (Washington DC) o +1 719 359 4580 US o +1 253 205 0468 US o +1 253 215 8782 US (Tacoma) o +1 346 248 7799 US (Houston) o +1 360 209 5623 US o +1 386 347 5053 US o +1 507 473 4847 US o +1 564 217 2000 US o +1 669 444 9171 US o +1 669 900 6833 US (San Jose) o +1 689 278 1000 US Meeting ID: 832 7801 0927 Find your local number: https://us02web.zoom.us/u/kdmBrBv6un

Award

Water / Sewer

$4,134,400.00

Public - City

Outdoor Lighting, Site Work

12

11

35

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Temporary Roads, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Erection, Closeout Submittals, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Remediation, Chemical Decontamination
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Furnishing Accessories, Waste Receptacles
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Transfer Switches, Manual Transfer Switches, Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Planting Preparation, Mulching
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Electrical Utilities, High-Voltage Switchgear and Protection Devices, Communications Utilities, Communications Distribution
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Mobile Plant Equipment, General Vehicles, Maintenance Vehicles
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
66
Bidding Soon
1,060
All Active Projects
476
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 17, 2025

April 1, 2025

img_map_placeholder

250 Brigden Dr, Battle Creek, MI

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Wellfield Power and Control Improvements - Contract C

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.