BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling of a municipal facility in Riverton, Utah. Completed plans call for the remodel of a municipal facility.

City Hall Bathroom Remodel Project Questions of a technical nature regarding this project or the specifications should be directed to Craig Calvert at 801-208-3175. Bid to remodel six restrooms in City Hall, 12830 South Redwood Road. Work will include removing and replacing the tile on the walls and the floor and removing and replacing the vanity tops and sinks. The tile on the walls is to be porcelain "Ice Rectangle" tile, white color, 12" x 24" with Schluter edging. the tile on the floors is to be porcelain "Pietra Italia" tile, beige color, 24" x 48" with a 6" high base out of the same tile with Schluter edging. The vanity tops are to be quartz composite, Tofino RU119 color, 3/4" thick with a 6" back splash and 6" front face out of the same material mounted on existing brackets. Sinks are to be 18-1/2" x 13-3/4" rectangular, undermount, white porcelain. The work cannot be done all at the same time. It is anticipated that two restrooms (a set) will be done at the same time. The City will remove the fixtures (toilets, urinals, partitions, faucets and under sink plumbing) prior to construction and then will reinstall the fixtures after construction. It is anticipated that it will take the City threeweeks to re-install the fixtures and then remove the next set of fixtures. After that the contractor can move on to the next set of restrooms. Because of that the selected contractor must coordinate with the City on the construction schedule. The contractor's time to complete their part of the construction on a set of restrooms is seven (7) calendar days.

GC Bidding

Municipal

$110,000.00

Public - City

Remodeling

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
21
Bidding Soon
511
All Active Projects
186
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 31, 2024

January 30, 2025

img_map_placeholder

12830 S Redwood Rd, Riverton, UT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.