BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 18, 2024 at 7:00 PM

Updated December 19, 2024

This is a service / maintenance or supply contract in Santa Ana, California. Contact the soliciting agency for additional information.

Deadline for Consultants to submit questions regarding this RFQ/RFP January 07, 2025 by 4:00PM Questions or Clarifications: All questions must be submitted in writing, via email to: FacilitiesRFP@rsccd.edu. By way of this Request for Qualifications/Request for Proposals ("RFQ/RFP"), the Rancho Santiago Community College District ("District") is requesting Statements of Qualifications and Proposals ("Responses") to provide Campus Utility Mapping and Investigation Services ("Services") for a District Wide Utility Survey at Santa Ana College (SAC) & Santiago Canyon College (SCC). The purpose of this RFQ/RFP is to obtain information that will allow the District to select a qualified Firm ("Consultant" or "Firm") to provide Services for this project on behalf of the District. The District has an immediate need for assessing, investigating, validating and documenting all existing utility components & infrastructure. The District reserves the right and discretion to determine if any Responses will be utilized to add firms to the list of pre-qualified firms for future RFPs. The Project is located at two (2) sites that include Santa Ana College (SAC) and Santiago Canyon College (SCC). Santa Ana College is located 1530 W. 17th St. in Santa Ana, CA and Santiago Canyon College is located at 8045 E. Chapman Ave. in Orange, CA. Over the years, the District has had various projects completed on the Santa Ana College and Santiago Canyon College campuses. This includes new construction, renovation, and improvement-based projects to support faculty and staff operation. It's been a challenge to maintain a uniform as-built document capturing all utility information and infrastructure at each campus to date given the magnitude of projects completed. In order to support future construction projects and any reference needs required, the District is seeking utility mapping and investigation services to compile and provide a complete and comprehensive survey document that captures and verifies all present utility information including locations at SAC and SCC. Total Estimated Project Schedule Duration ~16-17 months The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

Public - County

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
572
Active Projects
289
Bidding Soon
4,005
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2025

Project location map

Multiple Locations, Santa Ana, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.