Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Greeley, Colorado. Conceptual plans call for the renovation of a educational facility.
Reference Number 0000370938 Weld County School District 6 (Greeley/Evans) is requesting statements of qualifications and proposals from Architectural/Engineering (A/E) teams to assist the District in the design and construction for the replacement of twenty-eight (28) rooftop units at Centennial Elementary School and one furnace/DX unit at District 6 Online Academy. Construction is planned for June-July, 2026. Question Deadline 01/08/2025 at 12:00 PM MT Questions are submitted online No, All questions should be directed via email District 6: Scott Francies Purchasing Manager District 6 Finance Department Email: sfrancies@greeleyschools.org In order to procure equipment in time for summer 2026 installation, design must be complete by June 20, 2025. The project will go out for bid in July 2025, Board of Education approval of the construction contract in August 2025, submittal review and equipment procurement in September 2025. Centennial Elementary RTU Replacement 1. Location: 1400 37th St, Evans, CO 80620 2. The Facility: Centennial Elementary was constructed in 1975. Renovations and additions occurred in 1980, 2010 and 2024. The current building area (excluding modular buildings) is 44,500 SF. 3. Project Scope: Provide design documents to replace twenty-seven (27) Carrier rooftop units like-for-like. Refer to attached RTU schedule for units in scope. Additionally, replace one (1) Reznor Heating & Ventilation unit with a Carrier rooftop unit with gas-fired heating and DX cooling. Renumber rooftop units as shown on the attached schedule. Coordinate RTU numbering with fire alarm system and fire map as required. 4. Budget: The projected construction budget is $1,000,000. D6 Online Academy HVAC Replacement 1. Location: 1113 10th Ave, Greeley, CO 80631 2. The Facility: District 6 Online Academy is a 5,380 SF facility that was built in 1965. The building houses staff and students that are part of the online program. The HVAC system consists of a residential-style furnace and rooftop mounted condensing unit with blower assembly that provide heating and cooling through under-slab supply ductwork and overhead return ductwork. Lay-in ceiling exists throughout. 3. Project Scope: Base Scope Provide design documents to replace the HVAC system with new overhead supply and return ductwork. HVAC system type may be furnace/DX or a fan coil unit, depending on layout and required clearances. Refer to attached floor plan showing mechanical room on the west end. Alternate Scope (If selected, takes the place of Base Scope) Provide design documents for the like-for-like replacement of the existing furnace/DX system. Include cleaning of under-slab and overhead ductwork in scope. 4. Budget: The projected construction budget for the base scope is $400,000, and the projected construction budget for the alternate scope is $65,000. The District reserves the right to accept or reject, any or all submittals, and select the D/B/B team that is deemed to be in the Owner's best interest.
Conceptual
Educational
$1,065,000.00
Public - County
Renovation
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 16, 2026
Multiple Locations, Greeley, CO
Related To This Project
Greeley, CO
Bid Date: Jan 14 2025
Greeley, CO
Bid Date: Jan 21 2025
Greeley, CO
Bid Date: Jan 21 2025
Greeley, CO
Bid Date: Dec 23 2024
Greeley, CO
Bid Date: Jan 17 2025
Greeley, CO
Bid Date: Jan 28 2025
Greeley, CO
Bid Date: Jan 23 2025
Greeley, CO
--
Greeley, CO
Bid Date: Jan 17 2025
Greeley, CO
--
Greeley, CO
--
Greeley, CO
Bid Date: Dec 06 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
New Year, New Possibilities. Make the connections you need to kickstart 2025.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.