BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 22, 2025 at 7:00 PM

Updated February 23, 2025

Site work for a playground / park / athletic field in Greensboro, North Carolina. Completed plans call for site work for a playground / park / athletic field.

Center City Park, 200 N. Elm Street, Greensboro, NC 27401, was constructed in 2003. The fountain is multi-level, holds approximately 30,000 gallons of water contained in several plaster lined pools, and has several elements run as a show set on an 1 hour loop. The fountain is filled and runs year-round, unless prolonged periods of sub-freezing weather are expected. The fountain has undergone several repairs over the years, and has most recently had plaster patched in 2022. The fountain has developed several leaks which are causing water to weep out and run across the brick paths that surround the fountain. In-house dye testing has identified the leaks as occurring at expansion joints that have previously been caulked, and that the caulking is deteriorating. Current concerns center on stopping these leaks to prevent ice from building up on the paths during the winter, improving aesthetics, and preventing further damage to the fountain. Questions regarding this event may be submitted through online.

Award

Playgrounds / Parks / Athletic Fields

$25,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
307
Active Projects
181
Bidding Soon
2,219
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2025

March 14, 2025

Project location map

200 N Elm St, Greensboro, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.