Published January 23, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Smithville, Oklahoma. Completed plans call for site work for a water / sewer project.

Project includes the furnishing of labor, equipment, and materials to construct: Installation of approximately 13,200 LF of 6-inch waterline and 84 foot high standpipe. Contracts to include furnishing and installation all appurtenances and incidentals necessary to provide a complete installation. Each Bid Must Be Accompanied by a Bid Bond Payable to the Owner for Five Percent (5%) of the Total Amount of the Bid. A Certified Check May Be Used in Lieu of a Bid Bond. Performance and Maintenance and Statutory Payment Bonds in the Amount of 100 Percent (100%) of the Contract Price, With a Corporate Surety Approved by the Owner, Will Be Required for the Faithful Performance of the Contract. The Owner May Waive Any Informalities or Minor Defects or Reject Any and All Bids. Any Bid May Be Withdrawn Prior to the Above Scheduled Time for the Opening of Bids or Authorized Postponement Thereof. The Owner Reserves the Right to: Change Dates the Bid Will Be Considered; Waive All Informalities; Reject Any and All Bids; Choose Whether to Accept Alternates, if Applicable; Adjust Quantities; and Add or Omit Items of Work as Deemed Necessary to Conform With Budget or Other Constraints; and to Accept That Bid Deemed Most Advantageous for Value Received.

Post-Bid

Water / Sewer

$600,000.00

Public - County

Site Work

16

14

15

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Design Data, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Erection, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment, Vegetation Control, Shoring and Underpinning, Shoring, Sheet Piling, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Sprigging
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Service Connections, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
10
Bidding Soon
195
All Active Projects
80
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2025

February 17, 2025

img_map_placeholder

Multiple Locations, Smithville, OK


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Water System Improvements Contract 1 - Waterline Extension and Contract 2 - New Standpipe

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.