Published July 16, 2025 at 8:00 PM

Updated August 28, 2025

Site work and new construction of a water / sewer project in Bellingham, Massachusetts. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Construction of a new water treatment building at the site of the existing Hartford Avenue WTP Estimated Project Duration: 730 calendar days from Notice to Proceed Construction of a new water treatment building south of the existing Hartford Avenue Water Treatment Plant. The new building will include ballasted flocculation pre-treatment systems for total organic carbon removal, (granular activated carbon) pressure vessels for PFAS removal, chemical feed systems, a process water holding tank, and ancillary equipment and controls. The building will also include office space, and a bathroom, provisional space for future PFAS treatment equipment, and associated electrical and mechanical systems. The work of this project shall be substantially complete within 670 calendar days and ready for final payment within 730 calendar days from the date of award. Required for This Work: 1. Masonry 2. Miscellaneous and Ornamental Iron 3. Waterproofing, Damp-proofing and Caulking 4. Roofing and Flashing 5. Glass and Glazing 6. Painting 7. Plumbing 8. Heating Ventilating and Air Conditioning 9. Fire Protection Sprinkler Systems 10. Electrical This Advertisement Does Not Obligate the Owner for Any Costs Associated With Preparing or Submitting Bids. the Successful General Bidder and Each Successful Filed Sub-bidder Must Furnish a 100 Percent Performance Bond and a 100 Percent Payment Bond With a Surety Company Acceptable to the Owner. Minimum Wage Rates as Determined by the Executive Office of Labor and Workforce Development Under the Provisions of M.g.l., Chapter 149, Section 26 to 27d, as Amended, Apply to This Project. It is the Responsibility of the Contractor, Before Bid Opening, to Request if Necessary, Any Additional Information on Minimum Wage Rates for Those Trades People Who May Be Employed for the Proposed Work Under This Contract Federal Minimum Wage Rates as Determined by the United States Department of Labor Under the Davis-bacon Act Also Apply to This Project. he Goals for This Project Are a Minimum of 4.20 Percent D/mbe Participation and 4.50 Percent D/wbe Participation by Certified Dbes. The Two Low Bidders Shall Submit Completed Dbe Forms (Eeo-dep-190c, Eeo-dep-191c and the Dbe Certification of United States Citizenship Form) by the Close of Business on the Third Business Day After Bid Opening. Failure to Comply With the Requirements of This Paragraph May Be Deemed to Render a Proposal Nonresponsive. No Waiver of Any Provision of This Section Will Be Granted Unless Approved by the Department of Environmental Protection (Massdep).

Bid Results

Water / Sewer

$27,280,890.00

Public - City

New Construction, Site Work

197

26

29

7

Subscribe For Documents

136 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
611
Active Projects
280
Bidding Soon
4,209
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2025

August 25, 2025

Project location map

340 Hartford Ave, Bellingham, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.