Site work and paving for a mixed-use development in Dorval, Quebec. Completed plans call for site work for a road / highway; for paving for a road / highway; and sidewalk / parking lot.
Reference Number 0000288779 Question Acceptance Deadline Question Deadline 04/26/2025 at 3:00 PM ET DV0004 – ROAD ACCESS PROJECT – Phases 1 and 2 We hereby inform you of a notice of procurement for the first phase of work on Project DV0004 – Road Access to Montréal-Trudeau International Airport. 1. Context Several projects will be deployed over the next few years at Montréal-Trudeau International Airport to allow for adequate passenger reception in a context of phenomenal growth in activities. Moreover, this notice of procurement is linked to the “2028-2035 Flight Plan” (Projets D'avenir | Aéroport de Montréal), which is currently being deployed. Taking this into account and knowing that the number of passengers will increase in the coming years, it is essential for Montréal-Trudeau International Airport to carefully plan the development of its facilities and the improvement of its infrastructure so that they can accommodate passengers. The objective of the Project is to redevelop the road network, including municipal and technical networks to connect future public drop-off areas to neighboring road networks. The Project also aims to design vehicle routing to the various components of the systems, including the future P5 proximity parking lot and surface parking lots. Construction deliverables will include, but are not limited to, the following work: • Mitigation measures and traffic maintenance; • Demolition of existing assets; • Construction of ramps and related services; • Construction of technical structures (overpass, pumping station, underground retention basins, infrastructure, etc.); • Landscaping. 2.Scope of the Project a) Sub-project DV0004-1 Southwest road development: Summary description Sub-project 1 more specifically concerns the work to build the V-4 overpass as well as a section of the future Roméo-Vachon Sud boulevard. This work is mainly outside the existing vehicular traffic links, with the exception of the work associated with the construction of the V-4 overpass, which will require mitigation measures, as well as the closure and/or diversion of existing ramps. The complete redevelopment of underground infrastructure is planned in the scope of the work. Figure 1 (attached) shows, schematically, the work limit of subproject 1. b) Subproject DV0004-2 Southeast road development: Summary description Subproject 2 mainly concerns the development work of the P8 surface parking lot and the connection of the future Roméo-Vachon Sud boulevard with the existing one. It also includes the tunnel for the multifunctional cycle path and the construction of a section of this path, involving work on municipal and technical networks. The complete redevelopment of underground infrastructure is planned in the scope of the work.In terms of the impact on the vehicular traffic network, subproject 2 will require the partial closure of Arthur-Fecteau Street and the implementation of temporary measures during the connection of the future Roméo-Vachon Sud Boulevard to the existing network at the exit of the YUL territory. Figure 2 (attached) shows, schematically, the work limit of subproject 2.
Post-Bid
Roads / Highways
$3,000,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 6, 2025
July 7, 2025
boul. Roméo-Vachon N, Dorval, QC
Related To This Project
Dorval, QC
Bid Date: Jan 28 2025
Dorval, QC
Bid Date: Feb 17 2025
Dorval, QC
Bid Date: Jan 17 2025
Dorval, QC
Bid Date: Feb 21 2025
Dorval, QC
Bid Date: Feb 13 2025
Dorval, QC
Bid Date: Feb 14 2025
Dorval, QC
Bid Date: Feb 27 2025
Dorval, QC
Bid Date: Feb 19 2025
Dorval, QC
Bid Date: Jan 17 2025
Dorval, QC
Bid Date: Dec 17 2024
Dorval, QC
Bid Date: Jan 15 2025
Dorval, QC
Bid Date: Dec 13 2024
Dorval, QC
Bid Date: Dec 03 2024
Dorval, QC
Bid Date: Oct 24 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.