EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 4, 2025 at 7:00 PM

Updated October 1, 2024

Site work and new construction of a mixed-use development in Middleborough, Massachusetts. Completed plans call for the construction of a 9,500-square-foot water / sewer project; for site work for a water / sewer project; 4,500-square-foot pre-engineered storage facility; and pre-engineered storage facility.

The scope of work also includes construction of anew 4,500 square foot vehicle storage facility, demolition of existing underground water treatment infrastructure, existing garage, and exterior rehabilitation of the existing historical pumping station. The Contractor shall fully complete the project within 915 consecutive days of the start date fixed in the Notice to Proceed. Bid security for all general bidders and sub-bidders in the form of a bid bond, cash, certified check, treasurers or cashiers check, payable to the Owner, is required in the amount of 5percent of the total bid, in accordance with the conditions in Section 00 21 13 INSTRUCTIONS TO BIDDERS. The selected contractor shall furnish a performance bond and a payment bond in amount at least equal to one hundred percent (100%) of the contract price as stipulated in Section 00 72 00 GENERAL CONDITIONS of these specifications. Per Section 00 31 43.b MassDOT Permit Approval, a three (3) year Performance Bond for the amount of $218,610.00 is required prior to starting any construction work within the state highway layout. Subcontractors shall file with their sub-bids a copy of their DCAMM Certificate of Eligibility and Sub-Bidders Update Statement. Disadvantaged Business Enterprise (DBE) goals are applicable to the total dollars paid to the construction contract. The goals for this project are a minimum of 4.20% percent D/MBE participation and 4.50% percent D/ WBE participation by certified DBEs. The two low Bidders shall submit completed DBE forms (EEO-DEP-190C, EEO-DEP-191C and the DBE Certification of United States Citizenship form) by the close of business on the third business day after bid opening. Failure to comply with the requirements of this paragraph may be deemed to render a proposal nonresponsive. No waiver of any provision of this section will be granted unless approved by the Department of Environmental Protection(MassDEP). It is the responsibility of the Bidder, before bid opening, to request if necessary, any additional information on Prevailing Wage Rates for those trades people who may be employed for the proposed work under this contract. Federal Minimum Wage Rates as determined by the United States Department of Labor under the Davis-Bacon Act also apply to this project. By submission of a bid, the Bidder agrees that this bid shall be good and may not be withdrawn for a period of 30 days, Saturdays, Sundays and legal holidays excluded after the opening of bids. This project requires compliance with Massachusetts Diesel Retrofit Program [MDRP] by use of after-engine emission controls that are EPA certified, or their equivalent, on at least 100% of the off-road [non-registered] diesel vehicles/equipment used at the job site. The Owner reserves the right to waive any informalities in bids and to reject any or all bids.

GC Bidding

Water / Sewer

$28,600,000.00

Public - City

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

66 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing

Find More Local Projects

Within 75 Miles of This Project
300
Active Projects
165
Bidding Soon
2,319
All Active Projects
1,042
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2025

June 23, 2025

img_map_placeholder

55 E Grove St, Middleborough, MA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

East Grove Street Water Treatment Facility - GC

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.