Published April 23, 2025 at 8:00 PM
Updated April 24, 2025
Site work and new construction of a mixed-use development in Middleborough, Massachusetts. Completed plans call for the construction of a 9,500-square-foot water / sewer project; for site work for a water / sewer project; 4,500-square-foot pre-engineered storage facility; and pre-engineered storage facility.
The scope of work also includes construction of anew 4,500 square foot vehicle storage facility, demolition of existing underground water treatment infrastructure, existing garage, and exterior rehabilitation of the existing historical pumping station. The Contractor shall fully complete the project within 915 consecutive days of the start date fixed in the Notice to Proceed. Bid security for all general bidders and sub-bidders in the form of a bid bond, cash, certified check, treasurers or cashiers check, payable to the Owner, is required in the amount of 5percent of the total bid, in accordance with the conditions in Section 00 21 13 INSTRUCTIONS TO BIDDERS. The selected contractor shall furnish a performance bond and a payment bond in amount at least equal to one hundred percent (100%) of the contract price as stipulated in Section 00 72 00 GENERAL CONDITIONS of these specifications. Per Section 00 31 43.b MassDOT Permit Approval, a three (3) year Performance Bond for the amount of $218,610.00 is required prior to starting any construction work within the state highway layout. Subcontractors shall file with their sub-bids a copy of their DCAMM Certificate of Eligibility and Sub-Bidders Update Statement. Disadvantaged Business Enterprise (DBE) goals are applicable to the total dollars paid to the construction contract. The goals for this project are a minimum of 4.20% percent D/MBE participation and 4.50% percent D/ WBE participation by certified DBEs. The two low Bidders shall submit completed DBE forms (EEO-DEP-190C, EEO-DEP-191C and the DBE Certification of United States Citizenship form) by the close of business on the third business day after bid opening. Failure to comply with the requirements of this paragraph may be deemed to render a proposal nonresponsive. No waiver of any provision of this section will be granted unless approved by the Department of Environmental Protection(MassDEP). It is the responsibility of the Bidder, before bid opening, to request if necessary, any additional information on Prevailing Wage Rates for those trades people who may be employed for the proposed work under this contract. Federal Minimum Wage Rates as determined by the United States Department of Labor under the Davis-Bacon Act also apply to this project. By submission of a bid, the Bidder agrees that this bid shall be good and may not be withdrawn for a period of 30 days, Saturdays, Sundays and legal holidays excluded after the opening of bids. This project requires compliance with Massachusetts Diesel Retrofit Program [MDRP] by use of after-engine emission controls that are EPA certified, or their equivalent, on at least 100% of the off-road [non-registered] diesel vehicles/equipment used at the job site. The Owner reserves the right to waive any informalities in bids and to reject any or all bids. Bid Results MASONRY Costa Brothers Masonry - $1189000 MISCELLANEOUS AND ORNAMENTAL IRON Quinn Brothers of Essex Inc - $215000 WATERPROOFING DAMPPROOFING CAULKING Beacon Waterproofing - $268240 ROOFING AND FLASHING Young Developers LLC - $584400 METAL WINDOWS Greenfield Glass - $315648 ACOUSTICAL TILE K&K Acoustical Ceilings Inc - $27200 PAINTING Dandis Contracting Inc - $228175 FIRE PROTECTION Rustic Fire Protection - $150500 PLUMBING Robert W. Irvine & Sons - $328800 HVAC CAM H.V.A.C. & Construction Inc - $687000 ELECTRICAL WORK LeVangie Electric Co - $1840000
Bid Results
Water / Sewer
$5,833,963.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 18, 2025
June 13, 2025
55 E Grove St, Middleborough, MA
Related To This Project
Middleborough, MA
Bid Date: Apr 25 2025
Middleborough, MA
Bid Date: Sep 18 2025
Middleborough, MA
Bid Date: Jan 17 2025
Middleborough, MA
Bid Date: Feb 27 2025
Middleborough, MA
Bid Date: Feb 27 2025
Middleborough, MA
Bid Date: Mar 17 2025
Middleborough, MA
Bid Date: Apr 16 2025
Middleborough, MA
Bid Date: Jul 08 2020
Middleborough, MA
Bid Date: Dec 12 2024
Middleborough, MA
--
Middleborough, MA
Bid Date: Aug 23 2024
Middleborough, MA
Bid Date: Jul 10 2024
Middleborough, MA
Bid Date: Jul 10 2024
Middleborough, MA
Bid Date: Jun 05 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.