Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published December 19, 2024 at 7:00 PM
Updated December 20, 2024
Site work and paving for a mixed-use development in Germantown, Wisconsin. Conceptual plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Solicitation Id: SE-02 Route : STH 167E Limit : IH41 E ON/off Ramps -S STH 145, STH 145 TO Wasaukee Rd County : Washington County, Ozaukee County Anticipated Construction Cost:$12,000,000-$12,999,999 The Pavement Needs Treatment to Extend Its Service Life. Perpetuation Project to Resurface Approximately 1.96 Miles of Sth 167 From Sth 145 to Wasaukee Rd in the Village of Germantown in Washington County. The Pavement is Anticipated to Receive a 2.5" Mill and Overlay of New Hma. Additional Items Include New Vehicle Detection Loops in Base Course at Sth 167 & Eisenhower Dr./forest Dr. Intersection, and Surface Replacement of Railroad Crossing, and Repair/replace Various Culverts. Perpetuation Project to Resurface Approximately 2.69 Miles of Sth 167 From the Ih 41e on/off Ramps to Sth 145 S in the Village of Germantown in Washington County. The Pavement is Anticipated to Receive a 3" Mill and Overlay of New Hma. Additional Items Include Full-depth Base Patching as Needed, Upgrading Signals To Monotubes at River Lane, Division Road, Western Avenue, Squire Drive, Legend Avenue, and Pilgrim Road Intersections, Replacing Guardrail at Two Locations, New Sidewalk on North Side of Sth 167 From Pilgrim Road to West of Montgomery Drive, Updating Curb Ramps, Cleaning and General Maintenance at Cross-culverts In Various Locations, Replacing Existing Signing, New Pavement Marking, and Real Estate Acquisitions. DBE Goal: DBE Goal in $ 0.00 Anticipated Project Start Date: 04/01/2025 Anticipated Project Completion Date: 12/31/2030 The Method of Contractor Selection Has Not Been Determined at This Time. WIDOT - RFP Engineering - V Germantown, Lannon & Mequon Rd *The Value for This Project is Based on a Financial Range. The Value is Listed as the Highest Possible Cost From the Range Provided by a Stakeholder or Official Project Document.
Conceptual
Roads / Highways
$12,999,999.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2025
WI-167, Germantown, WI
Related To This Project
Germantown, WI
--
Germantown, WI
--
Germantown, WI
--
Germantown, WI
Bid Date: Feb 27 2025
Germantown, WI
Bid Date: Mar 13 2025
Germantown, WI
--
Germantown, WI
Bid Date: Mar 13 2025
Germantown, WI
Bid Date: May 01 2025
Germantown, WI
--
Germantown, WI
Bid Date: Oct 23 2024
Germantown, WI
Bid Date: Oct 04 2024
Germantown, WI
Bid Date: Sep 12 2024
Germantown, WI
--
Germantown, WI
--
Germantown, WI
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
