EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 14, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a civil project in East Cocalico Township, Pennsylvania. Completed plans call for site work for a water / sewer project.

All Bids are to be accompanied by a bid bond in the amount of 10% of the Total Bid Price. A sample bid bond format is provided as part of the Contract Documents. The Work will include but will not necessarily be limited to providing all labor, materials, equipment, and appurtenances for the following, as further described in the Contract Documents. Scope of work has been divided into the following two contracts. Contract No. 1- General Construction (GC): The scope consists of supplying and installation of a new raw water tank, all facility upgrade piping, valves, coordination of other contracts, and all other miscellaneous work not covered by Contract No. 2. The scope also includes installation of a pre-purchased Ultrafiltration (UF) system with auxiliary equipment and controls, installation of a pre-purchased Ultraviolet (UV) disinfection units, along with a UVT panel and related piping and valves. The scope also includes wall and roof repairs per Drawing A-1 and demolition of the existing pressure filters and associated piping and valves as well as unused chemical feed systems. Refer to Appendix E for items to be removed and salvaged. Contract No. 2- Electrical Construction (EC): The scope consists of supplying and installation of VFDs, electrical panels, disconnects, cables, instrumentation, conduits and wiring for all pumps, equipment, electrical valves and other devices in this contract, including UF and UV panels supplied by the respective manufacturers. The scope also includes demolition of unused electrical panels, disconnects, and associated conduits and wiring. UF System Supplier: UF System and auxiliary equipment has been pre-purchased by ECTA. GC and EC shall install all equipment, piping, valves, controls, and related electrical work. UF System Supplier's scope of services is specified in Section 13220, Appendix F, and as shown on the P&IDs under their scope. UV system supplier: UV System has been pre-purchased by ECTA. GC and EC shall install all equipment, piping, valves, controls, and related electrical work. UV System Supplier's scope of services is specified in Section 11390, Appendix H, and as shown on the P&IDs under their scope. All questions shall be submitted in writing via online. Questions received after January 17, 2025 at 4:30 PM regarding the project will not be acknowledged. This contract is subject to the non-discrimination in Employment/Contract Compliance Regulations Conditions. Contractors shall ensure that all employees and applicants for employment are not discriminated against because of their race, creed, color, age, religion, sex, or national origin. This contract is subject to the Federal Occupational Safety & Health Act of 1970 (OSHA) Conditions and the PA Act 127 (Public Works Employment). This contract is subject to Pennsylvania Human Relations Act 222 conditions. Davis Bacon Wage Rates apply to this project. Refer to General Conditions, Section 00600. Steel Products Procurement Act and American Iron and Steel apply to this project. Refer to General Conditions, Section 00600. The right is reserved by the Buyer to reject any or all bids, to waive technical defects and to accept the bid, which, in the judgment of the Buyer, is to its best interest. Each proposal must be accompanied by a certified check or acceptable bonds as specified. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bid Results:- Electrical Garden Spot Electric Inc $248,500 General Contractor LB Industries Inc $636,604

Award

Water / Sewer

$885,104.00

Public - City

Site Work

29

16

3

6

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
264
Active Projects
143
Bidding Soon
2,116
All Active Projects
996
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 24, 2025

February 24, 2025

img_map_placeholder

To Be Determined, East Cocalico Township, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Water Treatment Facility (GUDI) Upgrade Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.