BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 28, 2025 at 7:00 PM

Updated March 1, 2025

Renovation of an educational facility in Columbia, Missouri. Completed plans call for the renovation of a educational facility.

a. The Contractor shall furnish all labor, materials, tools, equipment necessary for, and incidental to, construction of this project as indicated on Drawings and specified herein. b. Work shall include everything requisite and necessary to finish work properly, notwithstanding that every item of labor or materials or accessories required to make project complete may not be specifically mentioned. c. General Description of Work: (1) Project consists of construction of a new 13,490 square foot addition to the Research Commons Thermal Plant. (2) Demolition shall consist of, but not limited to, site clearing and demolition of paving, utilities, infrastructure, and obstructions, as required to complete the work. (3) Civil work shall consist of, but not limited to, earthwork, exterior improvements, utilities, as required to complete the work. (4) Architectural work shall consist of, but not limited to, building panels, masonry façade and wall, doors, windows, louvers, thermal and moisture protection, openings, specialties, and furnishings, as required to complete the work. (5) Structural work shall consist of, but not limited to, drilled piers, concrete, steel, masonry, and metals, as required to complete the work. (6) Mechanical work shall consist of, but not limited to cooling towers, pumps, HVAC equipment, plumbing, piping, ductwork, insulation, fire suppression, and utilities, as required to complete the work. (7) Electrical work shall consist of, but not limited to motor controllers, transformers, distribution panels, grounding, lightning protection, power, controls, instrumentation, communications, raceways, cables, access control, fire detection, and utilities, as required to complete the work. CONSTRUCTION ESTIMATE: $7,439,580 - $8,266,200 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions regarding the scope of work should be directed to Jeff Gambrall with PRVN Consultants, Inc. at (319) 321-9922 or jgambrall@prvninc.com. Questions regarding commercial conditions should be directed to Ashley Karpel at (573) 882- 1349 or karpela@missouri.edu. A Diversity Participation goal of 10% MBE, 10% WBE, DBE and Veteran; 3% SDVE has been established for this contract. The Owner reserves the right to waive informalities in bids and to reject any and all bids. Per Addendum 4 The Bid Opening Date is being extended to February 13, 2025, at 1:30PM. All other provisions of the Advertisement for Bids remain unchanged.

Award

Educational

$10,097,000.00

Public - State/Provincial

Renovation

206

36

98

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
30
Bidding Soon
433
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2025

April 14, 2025

Project location map

Multiple Locations, Columbia, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.