EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 12, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a civil project in Syracuse, New York. Working plans call for site work for a water / sewer project.

**As of February 12, 2025, the project is on hold. No definite date for the rebid.** Reference Number 0000370960 Richmond Ave, Sackett St & Taylor St Pump Station Rehabilitation Project The Project consists of improvements and rehabilitation at each of the pump stations, including but not limited to pumping systems, valves, force main piping, structure rehabilitation, improvements or new valve vault structures, hatches, electrical systems, and instrumentation and controls. The project is located at three separate sites, which include: Richmond Avenue Pump Station - 500 Richmond Avenue; Sackett Street Pump Station - 858 Sackett Street; and Taylor Street Pump Station - 301 Taylor Street, which are all located in the City of Syracuse, Onondaga County, NY. A Minority Business Enterprise (MBE) utilization goal and a Women Business Enterprise (WBE) utilization goal has been established for this project and are as follows: 1) MBE Utilization Goal of 18% 2) WBE Utilization Goal of 12% Question Deadline 01/10/2025 at 2:00 PM ET Questions are submitted online No .Questions or concerns related to such programs should be directed to: Herman Howard Contract Compliance Officer Onondaga County Office of Diversity and Inclusion John H. Mulroy Civic Center, 15 th Floor 421 Montgomery Street Syracuse, NY 13202 Tel: (315) 435-3565 Fax: (315) 435-3453 Email: hermanhoward@ongov.net Participation Requirements - Minority Business Participation - Women-Owned Business Participation Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % -- Each bid must be accompanied by cash, certified check, or bid bond in an amount not less than five percent (5%) of the amount of the bid in the form and subject to the conditions provided in the Information for Bidders. In addition, the Contractor shall be required to provide a "Statement of Surety's Intent" with his bid. Successful Bidder shall be prepared to furnish a Performance and Payment Bond for 100% of the Contract amount. *The right is reserved to waive any informalities in the Bid and to reject any or all bids. The technical specifications and drawings were prepared Arcadis of New York, Inc., One Lincoln Center, 110 West Fayette Street, Suite 300, Syracuse, NY 13202. Questions concerning the Contract Documents should be addressed to Mr. Benjamin Tillotson, PE, via email to benjamin.tillotson@arcadis.com. Document Acquisition notes -- By submission of the $25.00 non-refundable payment, bidder will be registered as an official plan holder. Only official plan holders are eligible to bid on the project. Subcontractors, suppliers, equipment vendors, etc. will also be required to submit the non-refundable payment to receive the Contract Documents. Liverpool Blueprint, Inc. can be contacted by email at prints@liverpoolblue.com or by phone at 315-457-0472. Reference "Richmond Avenue, Sackett Street, Taylor Street Pump Station Rehabilitation" project in any correspondence.

Final Planning

Water / Sewer

$2,696,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

21

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Summary of Contracts, Work Restrictions, Coordination with Occupants, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Progress Payment Procedures, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Special Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Fire Protection, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Temporary Construction, Vehicular Access and Parking, Temporary Parking Areas, Temporary Roads, Traffic Control, Temporary Barriers and Enclosures, Temporary Barricades, Temporary Fencing, Execution and Closeout Requirements, Examination and Preparation, Protection of Adjacent Construction, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Site Maintenance, Starting and Adjusting, Closeout Submittals, Maintenance Data, Bonds, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Site Remediation, Chemical Decontamination
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Castings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners, Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Flexible Connectors
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Curbs and Gutters, Planting, Planting Preparation, Mulching, Turf and Grasses, Plugging, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts, Manufacturing Equipment, Dies and Molds, Molds, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
96
Bidding Soon
998
All Active Projects
459
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2025

August 13, 2025

img_map_placeholder

Multiple Locations, Syracuse, NY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Richmond Avenue, Sackett Street, And Taylor Street Pump Station Rehabilitation Contract No. 1 - General Construction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.