BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a residential development in East Fayetteville, North Carolina. Completed plans call for the demolition of a residential development; and for site work for a residential development.

Blight Removal Program: Demolition, Debris Removal, Lot Cleaning (2036 Rosehill Road) The City reserves the right to reject any or all bids and to waive all informalities concerning bid or award bid to the lowest, responsive, responsible bidder or bidders, taking into consideration quality, performance and the time specified in the proposals for the performance of the contract. Demolish and remove from site all buildings and structures, to include (if found to be present) well and/or pump houses, walls, foundations, footings, basements, roofing materials, doors, windows, steps, slabs, walkways, HVAC systems, pools, storage buildings, metal, wood, paper, glass, bottles, cans, garbage, and other debris present on thissite. If present, lawfully remove and/or fill and abandon private well(s) and septic tank(s). Clean lot. o There is one primary building and one secondary building to be removed from this site: (1) single-family residential home with a carport, storage room, and stoop (approximately 1,100 sf includes carport,storage room & stoop): (2) detached brick storage building (approximately 180 sf). o Lawfully complete Asbestos Containing Building Material Abatement (ACBM) for the subject property. o Remove underground and overhead wiring not connected to electrical service, and other items associated with the primary structure. o Remove all building and construction materials. o Remove all shrubs, bushes, and saplings from the entire site that measure four inches or less in diameter, to include lot line areas and rear lot area. o Remove all poles, post, rubbish, trash, debris, tall weeds, tall grass, undergrowth, vines, downed trees, dead trees (standing or fallen), fallen limbs, logs, and organic debris piles from lot. o Do NOT damage or remove concrete and/or asphalt driveway(s), parking area(s). o Do NOT damage or remove retaining walls located at front of lot and sides of driveway. o Do NOT damage or remove retaining walls, walkway, and steps located at rear of house. o Do NOT damage public sidewalks or utility assets. o Add fill and topsoil as needed to raise excavated areas to the same grade level as the existing surrounding soil When finished grading, surface of site shall be smooth and allow for natural drainage. NO dips, ridges, or low areas shall be present where ponding water may accumulate. NO clumps of soil, grass, or other debris shall remain. o Apply seed and straw to all areas of site where soil was disturbed, fill was added, or where bare soil is present. Loosen areas to be seeded to a depth of at least 2". Apply seed and straw of the following types and rates: Contractors Blend Grass Seed Mix - 1/2# / 100 SF; Wheat Straw - 1/2 Bale / 100 SF. o Contractor shall obtain, at their expense, ALL Required Permits, Licenses, Bonds, Insurance, Reports, Designs, Engineering, Inspections, and Certifications. o Contractorisresponsible for complying with ALL Local, City, County, State, and Federal, Codes, Laws, Legislation, Ordinances, Regulations, and Rules. o Contractorshall bear ALL cost associated with abatement of all identified Asbestos Containing Materials by a Licensed ACBM Abatement Contractor. o With the exclusion of lawful asbestos removal, the contractor shall NOT assign, subcontract, or transfer any rights under or interest in (including, but without limitation, monies that may become due or monies that are due) the Agreement without the written consent of the City of Fayetteville. o All work must be completed within 30 calendar days from the time the Notice to Proceed (Purchase Order) has been issued unless otherwise stated. o Contractor is responsible for providing at least 24-hours advance notice to the Economic & Community Development Department before work begins. Do not begin work until a response from ECD has been provided. o Contractor shall provide their invoice, landfill weigh tickets, asbestos disposal records, and other associated receipts and/or records for this project to the Senior Housing Program Specialist. o The project site shall be inspected by the Senior Housing Program Specialist in order to verify that all requirements contained in the Scope of Work have been satisfactorily completed before payment is processed.

Sub-Bidding

Residential Subdivision

$170,000.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
43
Bidding Soon
1,212
All Active Projects
466
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2025

February 5, 2025

img_map_placeholder

2036 Rosehill Rd, East Fayetteville, NC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.