BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 16, 2025 at 8:00 PM

Updated October 9, 2025

Demolition, site work and new construction of a clubhouse / community center in Miami, Florida. Completed plans call for the demolition of a clubhouse / community center; for the construction of a 10,000-square-foot clubhouse / community center; and for site work for a clubhouse / community center.

Reference Number 0000379941 Job Location: Esther Mae Armbrister Park Bid Intent Not Available The Esther Mae Armbrister Park Community Center is a new construction development project located at 4000 Grand Avenue, Miami, FL. The Project consists of the demolition of the existing Community Center building, and the construction of a new two-story facility of approximately 10,000 square feet. The new center shall include various amenities such as an administration office, reception area, warming kitchen, multi-purpose room, workrooms, elevator, restrooms, Information Technology (IT) room, sports equipment storage, and various security features. The project also includes landscaping and irrigation, an electrical power generator, and a parking area. During construction, a temporary facility including bathroom trailer & office container shall be provided for the City's staff. The site has known contamination, and the Contractor is required to ensure that workers are informed about safety precautions. Proper training is essential for both the Contractor and subcontractors, with a recommendation for training sessions of up to 24 hours. The Contractor must communicate site conditions and ensure that subcontractors provide necessary training and information to their workers. Additional information concerning the Scope of Work can be found in the Construction Drawings. The Project construction cost is estimated to be $11.7M. Question Deadline 04/08/2025 at 5:00 PM ET Questions are submitted online No, Written questions must be submitted online. Late questions will not be considered. Bonding Requirements - Bid Bond 5 % The City reserves the right to request additional/supplemental information and/or contact listed individuals pertaining to Bidder's ability to meet the above minimum requirements.

Bid Results

Clubhouse / Community Centers

$9,523,500.00

Public - City

Demolition, New Construction, Site Work

197

33

197

7

Subscribe For Documents

122 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
100
Bidding Soon
1,693
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.