BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 9, 2025 at 8:00 PM

Updated July 10, 2025

Site work for a civil project in Manchester, Washington. Design plans call for site work for a bridge / tunnel; and water / sewer project.

As of July 9, 2025, this project is in the design phase. Construction will begin in early 2027 with bidding at the end of 2026. *Previous solicitation listed below for reference:* Request for Qualifications Engineering Consultant Services for Colchester Drive, Duncan Creek Fish Passage Culvert CRP# 2633, Fed Aid: # (Tbd) Kitsap County Department of Public Works Kitsap County Department of Public Works (KCDPW) is soliciting Statements of Qualifications from qualified firms with fish passage and stream restoration design experience. Specialties involved in the design phase of this federally funded project include: Civil, Environmental, Geotechnical, and Structural Engineering, Public Outreach and Regulatory Permitting. The selected firm is expected to assist KCDPW during bidding and construction. Project Scope: The proposed project will replace an existing culvert system under Colchester Drive E in Manchester, WA with a fish-passable buried structure, restore the stream alignment and habitat complexity, and replace the existing comingled stormwater system with a new system and outfall. The roadway and prism will be restored to meet Kitsap County Road Standards. Consultant Scope: The work to be performed by the Consultant consists of, but is not limited to, designing and preparing the Plans, Specifications and Estimate (PS&E), and reports required for permitting and construction of fish-passage culvert and stormwater outfall. Schedule: Expected time period for this work will be from April 2025 through construction completion, which is anticipated by December 2027. Requirements: The consultant selected will be subject to Federal Equal Employment Opportunity (EEO) requirements. Disadvantaged Business Enterprise (DBE) program requirements assigned to the agreement will have a mandatory goal of sixteen percent (16%). Fee Estimate: The County estimates the Consultant fee for this project to be approximately $618,000. Questions regarding this solicitation shall be directed to Matthew Oxford, Capital Projects Manager, at moxford@kitsap.gov or (360) 307-4383. Americans with Disabilities Act (ADA) Information Kitsap County in accordance with Section 504 of the Rehabilitation Act (Section 504) and the Americans with Disabilities Act (ADA), commits to nondiscrimination on the basis of disability, in all of its programs and activities. This material can be made available in an alternate format by calling 360.337.5777. Title VI Statement Kitsap County, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The method of Contractor Selection has not been Determined at this time.

Design

Bridges / Tunnels

$618,000.00

Public - County

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2027

Project location map

Colchester Dr E, Manchester, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.