EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 28, 2024 at 7:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Jersey City, New Jersey. Completed plans call for the renovation of a educational facility; and parking garage.

Repair and Preventive Maintenance (Phase 1) of the NJCU Parking Structure and Plaza PURPOSE AND INTENT Pursuant to N.J.S.A. 18A:64-54, New Jersey City University ("NJCU" or the "University") is issuing this document, a Request for Proposals ("RFP") for the Repair and Preventive Maintenance (Phase 1) of the NJCU Parking Structure and Plaza to qualified general contractors to submit contractors to provide complete single prime construction costs to complete the below mentioned construction project per the contract documents. PURPOSE OF WORK New Jersey City University intends to do a phased repair of our Parking Structure on the main campus located in the Gilligan Student Building. We also want to ensure preventive maintenance is done to ensure that the parking structure is safe and usable throughout all phases of the project. SCOPE OF PROJECT The following is a basic overview of what we're requiring in this Phase. More information can be found in the attachments: Partial Depth Concrete Slab Repairs Full Depth Waffle Dome Slab and Rib Repairs Overhead Beam and Slab Repairs Overhead Rib Repairs Column Spall Repairs Installation of New Concrete Curbs Removal and Reinstallation of Existing Pavers Installation of New Expansion Joint Seals Removal and Replacement of Existing Protected Waterproofing Membrane System Removal and Replacement of Existing Traffic Bearing Membrane System Topping Slab Removal and Replacement The intent of this RFP is to award a contract to a responsible bidder, whose bid, conforming to this RFP, is most advantageous to NJCU, price and other factors considered. Should additional work be required that falls under the subject of the awarded contract during the contract term the University reserves the right to separately procure the individual requirements and subsequently requesting the contractor to submit a written proposal and upon approval, a purchase order will be issued to authorize the work. The University considers any information which it may have released either orally or in writing prior to the issuance of this RFP, to be preliminary in nature and the University shall not be bound by such information. The University's obligation is contingent upon the availability of funds. NJCU Response to Bidders with advertised Addendum #1 January 22, 2025 No special consideration will be provided to any bidder that does not attend the recommended Pre-Bid Meeting and/or Site Inspection. Question Deadline 01/15/2025 Inquiries regarding this RFP must be submitted in writing and can either be e-mailed to Edie DelVecchio, edelvecchio@njcu.edu, Jenell Santiago, jsantiago6@njcu.edu , and Amanda McGee, amcgee@njcu.edu. Addendum to this RFP, if any, will be posted electronically and emailed to anyone who obtained the bid. Telephone calls will not be permitted. Responses received after this time and date will not be considered. E-mailed and/or faxed proposals will not be accepted. The University is not responsible for lost or misdirected documents. Bids must be enclosed in a sealed envelope/package bearing the name of the Bidder and RFP # 24-006 clearly marked on the outside of the envelope. The prospective bidder assumes sole responsibility for submitting a complete bid proposal in response to this RFP. No special consideration will be given after bid proposals are opened because of a bidder's failure to comply with all requirements of the RFP.

Post-Bid

Parking Garage

$350,000.00

Public - State/Provincial

Renovation

14

19

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Mockups, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete, Maintenance of Concrete, Rehabilitation of Cast-in-Place Concrete, Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Architectural Concrete, Precast Concrete, Precast Structural Concrete, Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Unit Masonry, Clay Unit Masonry, Stone Assemblies, Stone Masonry
Division 05 - Metals

Division 05 - Metals

Decorative Metal
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Vapor Retarders, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Exterior Specialties, Protective Covers, Canopies
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Mercantile and Service Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Residential Furniture, Beds
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Escalators and Moving Walks
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Fill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Unit Paving, Planting, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Batching Equipment, Mixers
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
585
Active Projects
339
Bidding Soon
5,124
All Active Projects
2,476
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2025

February 28, 2025

img_map_placeholder

2039 John F. Kennedy Blvd, Jersey City, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Repair and Preventive Maintenance (Phase 1) of the New Jersey City University Parking Structure and Plaza

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.