BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 24, 2025 at 7:00 PM

Updated January 25, 2025

Demolition, site work, paving and new construction of a civil project in Springfield, Missouri. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; road / highway; and bridge / tunnel.

The project consists of demolition of existing low water crossing and approach roadway. Construction of a new clear span spread box beam bridge with approach roadway work, paving and any other incidental work in accordance with plans and specifications. Question Deadline 01/08/2025-The project is located in Section 23, Township 29N, Range 21W, Greene County, Missouri. The total length of improvements along the centerline of Farm Road 193 is approximately 428 feet. All questions about the meaning or intent of the Contract Documents shall be submitted to the Greene County Highway Department in writing. Questions must be received by the Greene County Highway Department at least four working days before the bid opening date. All bids shall be submitted as a hard copy. The Greene County Highway Department assumes no liability for mailed or shipped bids failing to arrive prior to the closing of bids. The Wage Rates applicable to this project have been predetermined as required by law and are set forth in the bid proposal. When Federal wage rates are applicable and included, this contract is subject to the "Work Hours Act of 1962" (P.L. 87-581; 76 Stat. 357) and implementing regulations. By virtue of statutory authority, preference shall be given on other than Federal Aid Projects to materials, products, supplies, provisions, and other articles produced, manufactured, made, or grown within the State of Missouri where same are of a suitable character and can be obtained at reasonable market prices in the State, are of a quality suited to the purpose intended and can be secured without additional cost over foreign products or products of other states. The Greene County Commission hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry or national origin in consideration for an award. Bidders are informed that all contractors are subject to full compliance with all applicable laws, ordinances, rules and regulations and the requirements of the Equal Opportunity Act as it is not the intent of the owner to arbitrarily dismiss any authorities.

Award

Bridges / Tunnels

$625,000.00

Public - County

Demolition, New Construction, Paving, Site Work

38

6

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
34
Bidding Soon
620
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2025

February 13, 2025

Project location map

N Farm Rd 193, Springfield, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.