Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 7, 2025 at 7:00 PM
Updated February 8, 2025
Renovation of a mixed-use development in Springfield, Missouri. Completed plans call for the renovation of a educational facility.
Glendale Auditorium Curtain Replacement Quote to replace existing Auditorium curtains, at Glendale High School Question Cut Off Date: 1/9/2025 05:00:00 PM (ET) ADDITIONAL INFORMATION: One valance curtain sewn in 1 section constructed from 25 oz IFR charisma, in black each finished with 50% sewn in fullness. The top shall be sewn to 3.5" heavy jute webbing. There shall be a #3 brass grommet with ties on 12" centers at the top. Both sides shall have a turnback and the bottom shall have a weighted hem. One main curtain sewn in 2 sections constructed from 25 oz IFR charisma, in black each finished with 50% sewn in fullness. The top shall be sewn to 3.5" heavy jute webbing. There shall be a #3 brass grommet with s-hooks on 12" centers at the top. Both sides shall have a turnback and the bottom shall have a weighted hem. One border curtain sewn in 1 section constructed from 20 oz IFR crescent, in black, each finished with 50% sewn in fullness. The top shall be sewn to 3.5" heavy jute webbing. There shall be a #3 brass grommet with ties on 12" centers at the top. Both sides shall have a turnback and the bottom shall have a weighted hem. Two leg curtains sewn in 1 section constructed from 20 oz IFR crescent, in black, each finished with 50% sewn in fullness. The top shall be sewn to 3.5" heavy jute webbing. There 01/7/25 shall be a #3 brass grommet with s-hooks on 12" centers at the top. Both sides shall have a turnback and the bottom shall have a weighted hem. One border curtain sewn in 1 section constructed from 20 oz IFR crescent, in black, each finished with 50% sewn in fullness. The top shall be sewn to 3.5" heavy jute webbing. There shall be a #3 brass grommet with ties on 12" centers at the top. Both sides shall have a turnback and the bottom shall have a weighted hem. One mid curtain sewn in 2 sections constructed from 20 oz IFR crescent, in black, each finished with 50% sewn in fullness. The top shall be sewn to 3.5" heavy jute webbing. There shall be a #3 brass grommet with s-hooks on 12" centers at the top. Both sides shall have a turnback and the bottom shall have a weighted hem. Two leg curtain sewn in 1 section constructed from 20 oz IFR crescent, in black, each finished with 50% sewn in fullness. The top shall be sewn to 3.5" heavy jute webbing. There shall be a #3 brass grommet with s-hooks on 12" centers at the top. Both sides shall have a turnback and the bottom shall have a weighted hem. One border curtain sewn in 1 section constructed from 20 oz IFR crescent, in black, each finished with 50% sewn in fullness. The top shall be sewn to 3.5" heavy jute webbing. There shall be a #3 brass grommet with ties on 12" centers at the top. Both sides shall have a turnback and the bottom shall have a weighted hem. One rear curtain sewn in 2 sections constructed from 20 oz ifr crescent, in black, each finished with 50% sewn in fullness. The top shall be sewn to 3.5" heavy jute webbing. There shall be a #3 brass grommet with s-hooks on 12" centers at the top. Both sides shall have a turnback and the bottom shall have a weighted hem. One seamless CYC curtain sewn in 1 section constructed from a white muslin each finished with 0% sewn in fullness. The top shall be sewn to 3.5" heavy jute webbing. There shall be a #3 brass grommet with ties on 12" centers at the top. Both sides shall have a turnback and the bottom shall have a pipe pocket. One lot of new hand line for all moving drapes. Three sandbag floor pullies for all full stage drapes. To include installation and disposal.
Bid Results
Educational
$300,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 13, 2025
February 12, 2025
2727 S Ingram Mill Rd, Springfield, MO
Related To This Project
Springfield, MO
Bid Date: Jan 30 2025
Springfield, MO
Bid Date: Jan 24 2025
Springfield, MO
Bid Date: Jan 27 2025
Springfield, MO
Bid Date: Feb 07 2025
Springfield, MO
Bid Date: Feb 07 2025
Springfield, MO
Bid Date: Feb 04 2025
Springfield, MO
Bid Date: Feb 06 2025
Springfield, MO
Bid Date: Jan 24 2025
Springfield, MO
Bid Date: Jan 14 2025
Springfield, MO
Bid Date: Dec 18 2024
Springfield, MO
Bid Date: Dec 13 2024
Springfield, MO
Bid Date: Jan 16 2025
Springfield, MO
--
Springfield, MO
Bid Date: Dec 20 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
